An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GANIL -SPIRAL 2010-2011 GANIL-SPIRAL: Physics Highlights and Ongoing projects

  2. Nuclear facilities in Europe KVI Gröningen Jyväskylä CERN-ISOLDE GSI DUBNA ORSAY GANIL Legnaro Catane GANILCoordinating Institution ENSAR: New I3 FP7 EU Program follow up of FP6 EURONS TNA GANIL: to provide access to GANIL

  3. NuPECC LRP2010 Recommendations-June 2010 • Complete ESFRI Facilities • FAIR with PANDA, CBM, NuSTAR and FLAIR • SPIRAL2 at GANIL including S3 and DESIR • Complete Major Upgrades • HIE-ISOLDE at CERN • SPES at INFN-LNL • AGATA

  4. 238U beam VAMOS Exogam N-wall LISE MUST 2 MAYA TPC ACTAR Selected recent Physics Highlights x ISOL ISOL SIRA In Flight

  5. 2010 Beam time available for physics High energy: 3615 h 61 expts IRRSUD: 1585 h SME : 1100 h VAMOS Exogam LISE

  6. GANIL in 2011 3 running periods in 2011 (4113 h): (no problem for HE physics experiments ) 18 March  –   15 May                    run1 23 May    -  27 July                 run2 29 August  –  16 October              run3 GANIL-SPIRAL1-SPIRAL2 General information to the community 2011- 2012 - 2013 rise of SPIRAL2 … towards a fruitful and coherent scientific program between GANIL- SPIRAL1 - SPIRAL2 • GANIL-SPIRAL 1 scientific program four months in 2012 • Deliver more than 350 UT in 2012 • (2 runs from March 15th -Oct 30th 2012) • GANIL –SPIRAL1 : 6 months in 2013 • The first beams of SPIRAL2 Phase 1 are expected in mid 2013.

  7. Fresh news from the SPIRAL upgrade Metallic beams from a FEBIAD ion source • Already more beams than presently delivered at SPIRAL! • Most beams have projected intensities > 106 pps for 1.5kW primary beam power New beams from FEBIAD (LIRAT, IBE): 2013 New beams from Booster (CIME energies): end of 2014 • Tests in SIRa • in May with 58Ni@ 75 AMeV • in July with 36Ar @95AMeV + SPIRAL Target Ionized as stable beams Ionised as radioactive beams Existing beams at SPIRAL FEBIAD ISOLDE GANISOL ISOL beams for GANIL

  8. AGATA physics campaigns 2010-15 1997-2002: R&D on highly segmented Ge detector 2003-2009: AGATA demonstrator (6.5 M€ ; 250 m.y.) 2010-2014: AGATA 1/3 (12 M€ ; 200 m.y.) 2015-20xx: AGATA 4p (25 M€ ; 200 m.y.) 2014/15  GANIL/SPIRAL2 ~10 ATC + 5 ADC 2010/11  LNL≥5 ATC 2012/13  GSI/FRS≥5 ATC + 5 ADC AGATA-15 + VAMOS AGATA-5 + PRISMA AGATA-10 @ FRS total eff. e ~ 6% total eff. e > 10% total eff. e > 15 %

  9. First production of a stable ion beam@GANIL using a resonant ionization laser ion source A Ga+ beam produced using GISELE (GANIL Ion Source using Electron Laser Excitation) and the source SOMEIL (Source Optimisée pour les Mesures d’Efficacité par Ionisation Laser). A First step towards a laser ion source dedicated to SPIRAL2 GISELE laser system Analysing magnet SOMEIL ion source Ga+ ion beam From N. Lecesne and the LARISSA group (Mainz)

  10. Belgodere Oct 2011 • First GANIL-PhD Award • To • Dr D.SUZUKI (IPN Orsay) • Missing mass spectroscopy on oxygen isotopes beyond the drip-line

  11. Signature of FAZIA MoU

  12. GANIL/SPIRAL1/SPIRAL2 Construction 2006-2014 High potential of the accelerator complex GANIL+SPIRAL 2 5 expts in Parallèl / 2 expts with exotic beams in parallel User >1000 SPIRAL2 High intensity frontier for both stable and « exotic » beams GANIL/SPIRAL 1 today SPIRAL2 CIME cyclotron RIB at 1-20 AMeV (up to 9 AMeV for ff) DESIR Facility low energy RIB HRS+RFQ Cooler Mi-2015 RIB Production Cave Up to 1014fiss./sec. S3 separator-spectrometer 2013 LINAC: 33MeV p, 40 MeV d, 14.5 A MeV HI A/q=2 source p, d, 3,4He 5mA A/q=3 HI source Up to 1mA Neutrons For Science

  13. Civil construction SPIRAL2 Phase 1 September 14th, 2011 Beginning of ground breaking: December 2010 End of excavation phase: May 2011 First concrete walls: September 2011 NFS S3 S3 Thanks to Ganil staff and SPIRAL2 project group Thanks for your patience and come to visit us At GANIL-SPIRAL2 new facility RFQ LINAC Ion sources Official Inauguration October 17th ,2011