1 / 16

Successful Beam-Beam Compensation with TEL1

Successful Beam-Beam Compensation with TEL1. Vsevolod Kamerdzhiev for Beam-Beam Compensation team. First BoS beam study with TEL1. #5352. TEL1 on P13. First BoS beam study with TEL1. #5352. TEL1 on/off, #5352. T1 T2 status P1 P13 P25 P14

kyle
Télécharger la présentation

Successful Beam-Beam Compensation with TEL1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Successful Beam-Beam Compensation with TEL1 Vsevolod Kamerdzhiev for Beam-Beam Compensation team

  2. First BoS beam study with TEL1 #5352 TEL1 on P13 APD meeting, May 30, 2007

  3. First BoS beam study with TEL1 #5352 APD meeting, May 30, 2007

  4. TEL1 on/off, #5352 T1 T2 status P1 P13 P25 P14 19.34 19.45 1 15.1 24.3 27.4 15.0 19.45 19.55 0 7.5 18.8 29.4 17.7 19.56 20.06 1 20.6 30.3 31.8 20.6 20.06 20.16 0 22.2 23.0 32.6 23.2 20.18 20.28 1 24.8 38.1 35.1 27.2 20.29 20.39 0 26.3 26.3 36.2 28.8 20.40 20.50 1 29.4 44.3 39.7 33.5 20.51 21.01 0 35.9 31.4 47.0 36.6 21.03 21.13 1 29.3 44.8 38.3 35.0 21.15 21.25 0 34.9 33.1 43.2 40.3 21.26 21.36 1 34.3 47.5 44.8 39.4 APD meeting, May 30, 2007

  5. BoS #5353 APD meeting, May 30, 2007

  6. TEL1 horizontal tune shift APD meeting, May 30, 2007

  7. TEL1 horizontal tune shift APD meeting, May 30, 2007

  8. TEL1 horizontal tune shift problem with the baseline APD meeting, May 30, 2007

  9. P1 tau, #5359 APD meeting, May 30, 2007

  10. P13 tau, #5359 APD meeting, May 30, 2007

  11. P25 tau, #5359 APD meeting, May 30, 2007

  12. Tau improvements, #5359 • P1 ~25%, ~40% • P13 ~20%, ~40% • P25 ~30% APD meeting, May 30, 2007

  13. Horizontal scan, #5467 APD meeting, May 30, 2007

  14. Tunes, #5467 APD meeting, May 30, 2007

  15. Study plan • BBCompensation during scraping • Both TELs simultaneously on one bunch • TEL1 tune shift vs TEV tune change • Increase e-beam size • Study the effects on emittance growth • Bunch length vs lifetime improvement • Losses and Schottky power vs e-noise APD meeting, May 30, 2007

  16. Summary • We used TEL1 for beam-beam compensation of a single proton bunch. • Repeatable lifetime improvement in the range of 15-65% has been demonstrated • Position scans suggest no harmful effects of horizontally displaced e-beam on protons (preliminary) • Based on the latest data we decided NOT to upgrade TEL1 magnetic system APD meeting, May 30, 2007

More Related