EETD Environmental Health and Safety Monthly Metrics December, 2013
EETD Accidents- Severity Note: Two accidents in Nov ’12 not considered OSHA reportable, but may be compensable. Accident in Nov ‘13 not considered OSHA reportable, but may be compensable
EETD Job Hazard Analysis (JHA)- Pending New Hire vs. Expired Metric Started Sep ‘13
EETD Incomplete Training Assignments * Does not include SEC0203 “External Monitoring” Notice
Incomplete Training by Course Type(Total Incomplete Assignments = 48)
Incomplete Training Assignments (Total = 48) Open Assignments by Dept. Open Assignments by Hire Date
Significant Safety Achievements- 12/13 • The old chemical disposal for 2013 has been completed. We had to dispose through the normal requisition system, but managed to get about 500 individual containers out of the lab areas! • Procedures, hazard placards and warning labels were posted in the B70 liquid nitrogen fill station area. • A new AHD 3911 draft was generated for high pressure hydrogen use in 62-220. • An EETD Safety Committee meeting was held on 12/5/13. We need to find a new committee chair. • Focus was placed on EHS0658 “Haz Com Update” training completion. We are down to only 1 incomplete assignment for all of EETD!
Short Term Safety Outlook- 12/13 • Assist with safety planning for the FLEXLAB start-up. • Assist with safety planning for the battery testing facility location at the Richmond Field Station. • Complete follow-up on the Lock-out/Tag-out corrective actions resulting from the recent ORPS report. • Start the Personal Protective Equipment self-assessment project. • Assist with the relocation of chemicals into new lab areas 70-114 and 70-116. Update CMS as needed. • Participate in the Electrical Safety Committee review and update of PUB-3000 Chapter 8. • Implement a new electronic lab inspection form for easier monthly lab area inspection documentation.