1 / 9

System Requirements

System Requirements. ESH2 or AT-FCX storage shelves AT-FCX not in eConfigurator until Sept. Use add-parts to order additional cabling until then. AT-FCX shelves must be RoHS compliant If not, the shelves must be replaced. Shelves currently shipping are RoHS compliant.

landen
Télécharger la présentation

System Requirements

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. System Requirements • ESH2 or AT-FCX storage shelves • AT-FCX not in eConfigurator until Sept. Use add-parts to order additional cabling until then. • AT-FCX shelves must be RoHS compliant • If not, the shelves must be replaced. • Shelves currently shipping are RoHS compliant. • Software disk ownership supported on the Filer. • 9XX • 3XXX • 6XXX • OnTap 7.1.1 or 7.2.1 (or later) • 7.1.0 or 7.2.0 are not supported! • Uses twice the storage HBA’s. If you don’t have free HBA’s you’ll need to add some. • SyncMirror and stretched MetroCluster are supported. • Fabric MetroCluster already has multipathing.

  2. Verify if RoHS compliant based on CPLD version • Change to Advanced Mode • “priv set advanced” • Use FCADMIN to obtain the CPLD revision • fcadmin device_map Loop Map for channel 3b: Translated Map: Port Count 17 7 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 Shelf mapping: Shelf 3: 61 60 59 58 57 56 55 54 53 52 51 50 49 48 Target SES devices on this loop: Shelf 3: 46 47 ….. ….. • fcadmin bridge cmd_cemi -d 3b.46 -c "cpld" Cont..

  3. Verify if RoHS compliant based on CPLD version • fcadmin bridge cmd_cemi -d 3b.46 -c "cpld" 21h45m11s SelID:3(255).MA IMS601550001296 8b.03 pfuID=32 ? RegisterCount: 20 Drive 00:80 Drive 01:80 Drive 02:80 Drive 03:80 Drive 04:80 Drive 05:80 Drive 06:00 Drive 07:80 Drive 08:80 Drive 09:80 Drive 10:80 Drive 11:80 Drive 12:80 Drive 13:80 Drive 14:00 Drive 15:80 HOST:20 HwId:0f SFP Reg2:52 SFP Reg1:22 Revision:24 MISC:00 0 8067:2c 1 8067:2e Fan control:96 Controller:98 ThumbCtlrId:57 Fan status:00 PSU0:0e PSU1:0e Status:08 Control:2d • The number 24 is in hex. The decimal equivalent is 36 • Revision should be equal to or greater than 24 hex

  4. New Configuration • Cable filer, shelves, etc. • Boot system • Manufacturing ships systems with root aggr, whose disks are assigned to the node. • If disks are not assigned • On the 1st Filer, go to Maint mode • Use ‘disk assign’ to assign disks. • reboot • ‘Init disks’ and create the root aggr. • On the 2nd filer, go directly to the Boot Menu and ‘Init disks’. Disks will be assigned automatically. • Use ‘storage show disk –p’ to validate wiring is correct.

  5. PROPERLY SHUT DOWN SYSTEM BEFORE OPENING CHASSIS. PROPERLY SHUT DOWN SYSTEM BEFORE OPENING CHASSIS. DISCONNECT AC POWER DISCONNECT AC POWER DISCONNECT AC POWER DISCONNECT AC POWER CORD BEFORE REMOVAL CORD BEFORE REMOVAL CORD BEFORE REMOVAL CORD BEFORE REMOVAL PCI 1 PCI 3 PCI 1 PCI 3 I I I I O O O O PCI 2 PCI 4 PCI 2 PCI 4 Console Console e0a e0b e0c e0d RLM e0a e0b e0c e0d RLM 0a 0b 0c 0d 0a 0b 0c 0d L L L L L L L L F C F C F C F C I I I I I I I I N N N N 0e LVD SCSI N N N N 0e LVD SCSI K K K K K K K K AC AC AC AC L L L L L L L L I I I I I I I I RLM RLM e0a e0b e0c e0d e0a e0b e0c e0d 0a 0b 0c 0d 0a 0b 0c 0d N F C N N F C N 0e LVD SCSI N F C N N F C N 0e LVD SCSI Console Console status status status status K K K K K K K K OPEN OPEN OPEN OPEN 2 Gb Fault Out In OPEN OPEN OPEN OPEN 2 Gb Fault Out In ESH2 ESH2 MODULE A SHELF 1Gb 2Gb PSU1 PSU2 ID MODULE A SHELF MODULE B 1Gb 2Gb PSU1 PSU2 ID MODULE B ESH2 ESH2 Fault In Out 2 Gb Fault In Out 2 Gb CAUTION CAUTION CAUTION CAUTION OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN 2 Gb 2 Gb Fault Fault Out In Out In ESH2 ESH2 MODULE A MODULE A SHELF SHELF 1Gb 2Gb PSU1 PSU2 1Gb 2Gb PSU1 PSU2 ID ID MODULE B MODULE B ESH2 ESH2 In Out Fault In Out Fault 2 Gb 2 Gb CAUTION CAUTION CAUTION CAUTION Cabling a Multipath HA Storage Configuration (non SAN) Steps 1. Connect Cluster Inter-connect cables 2. Connect inter-shelf disk cables 3. Connect primary path from the storage system to the first shelves 4. Connect standby path from the storage system to the first shelves 5. Connect the redundant primary path from the storage systems 6. Connect the redundant standby path from the storage systems

  6. Upgrading a system in the field • If using AT-FCX shelves, verify that they are RoHS compliant. If not, they need to be replaced. • Determine if there are free storage HBA’s via sysconfig. If not, add them. • Takeover/Giveback can be used to minimize client impact. • Determine if software disk ownership is enabled via ‘disk show’. If the command doesn’t work: • Halt both nodes and boot into Maint. Mode • ‘disk upgrade_ownership’ on both nodes (prior to adding cables!!)

  7. Upgrading system (cont.) • Install optical connection’s in final shelf of each loop. • Do cabling. If filer is cabled to A on the top shelf, it is connect to B ‘out’ connection on the bottom shelf. • Shelves should be cabled to different storage HBA’s • Verify cabling with ‘storage show disk –p’. ha27> storage show disk -p PRIMARY PORT SECONDARY PORT SHELF BAY ------- ---- --------- ---- --------- 4b.16 B 4a.16 A 1 0 4a.17 A 4b.17 B 1 1 4b.18 B 4a.18 A 1 2 4a.19 A 4b.19 B 1 3 4a.43 A 4b.43 B 2 11 4a.44 A 4b.44 B 2 12

  8. PROPERLY SHUT DOWN SYSTEM BEFORE OPENING CHASSIS. PROPERLY SHUT DOWN SYSTEM BEFORE OPENING CHASSIS. DISCONNECT AC POWER DISCONNECT AC POWER DISCONNECT AC POWER DISCONNECT AC POWER CORD BEFORE REMOVAL CORD BEFORE REMOVAL CORD BEFORE REMOVAL CORD BEFORE REMOVAL PCI 1 PCI 3 PCI 1 PCI 3 I I I I O O O O PCI 2 PCI 4 PCI 2 PCI 4 Console Console e0a e0b e0c e0d RLM e0a e0b e0c e0d RLM 0a 0b 0c 0d 0a 0b 0c 0d L L L L L L L L F C F C F C F C I I I I I I I I N N N N 0e LVD SCSI N N N N 0e LVD SCSI K K K K K K K K AC AC AC AC L L L L L L L L I I I I I I I I RLM RLM e0a e0b e0c e0d e0a e0b e0c e0d 0a 0b 0c 0d 0a 0b 0c 0d N F C N N F C N 0e LVD SCSI N F C N N F C N 0e LVD SCSI Console Console status status status status K K K K K K K K OPEN OPEN OPEN OPEN 2 Gb Fault Out In OPEN OPEN OPEN OPEN 2 Gb Fault Out In ESH2 ESH2 MODULE A SHELF 1Gb 2Gb PSU1 PSU2 ID MODULE A SHELF MODULE B 1Gb 2Gb PSU1 PSU2 ID MODULE B ESH2 ESH2 Fault In Out 2 Gb Fault In Out 2 Gb CAUTION CAUTION CAUTION CAUTION OPEN OPEN OPEN OPEN OPEN OPEN OPEN OPEN 2 Gb 2 Gb Fault Fault Out In Out In ESH2 ESH2 MODULE A MODULE A SHELF SHELF 1Gb 2Gb PSU1 PSU2 1Gb 2Gb PSU1 PSU2 ID ID MODULE B MODULE B ESH2 ESH2 In Out Fault In Out Fault 2 Gb 2 Gb CAUTION CAUTION CAUTION CAUTION Upgrading an existing active/active storage to Multipath HA Storage configuration Steps 1. Existing active/active storage controller configuration 1. Install optical SFPs into the last shelf of each loop 2. Connect the redundant primary and redundant standby paths to configure a Multipath HA storage Note: Before attempting an upgrade, check to ensure sufficient disk initiator ports are available

  9. Additional Information • Shawn Kung, Product Manager • Kiran Sreenivasamurthy, Product Engineer • Technical FAQ • Multipathing: http://wikid.netapp.com/w/Clustering_Group/MultiPath • Software Disk Ownership: http://wikid.netapp.com/w/McSAN_-_Software_based_disk_ownership • Technical Reports • Active-Active Controller Configuration Overview and Best Practice Guidelines • Storage Best Practices and Resiliency Guide • Engineering TOI • Email: dl-cfo-multipath