1 / 7

TEP PV test yard 4350 E. Irvington Rd.

TEP PV test yard 4350 E. Irvington Rd. TF. TF. TF. TF. TF. TF. TF. TF. Daily output from a 1.5 kW PV system. (24 Unisolar US-64 thin film modules; Fronius IG-2000 invtr). Y f = 5.3 h/day = 1935 h/yr (very high for no tracking)

Télécharger la présentation

TEP PV test yard 4350 E. Irvington Rd.

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TEP PV test yard 4350 E. Irvington Rd.

  2. TF TF TF TF TF TF TF TF

  3. Daily output from a 1.5 kW PV system (24 Unisolar US-64 thin film modules; Fronius IG-2000 invtr) Yf = 5.3 h/day = 1935 h/yr (very high for no tracking) Yf = “final yield” is defined in IEC standard 61724.

  4. Comparison of final yields in 6 places

  5. TF TF TF TF TF TF TF Support from AZRISE, TEP, NREL, SFAZ

More Related