1 / 4

IRP Review

IRP Review. IRPs with Significant Detail on Flexibility Assessment Portland General Electric Puget Sound Energy Other IRPs. Portland General Electric. Start with system dispatched to normal economic conditions Wind curtailment not assumed for Decs

lanza
Télécharger la présentation

IRP Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. IRP Review • IRPs with Significant Detail on Flexibility Assessment • Portland General Electric • Puget Sound Energy • Other IRPs

  2. Portland General Electric • Start with system dispatched to normal economic conditions • Wind curtailment not assumed for Decs • Demand curves based on load net wind at percentiles • Supply curves based on asset dispatch changes from starting state

  3. Puget Sound Energy • Production cost dispatch with AURORAxmp • Used load, wind, hourly scheduled interchange and forced outages for intra-hour flexibility simulation • 95% confidence interval to assess hour-ahead need for balancing reserves • Proxy CPS2 score

  4. Other IRPs • Forecast reserve requirements • Wind integration studies • PacifiCorp forecast reserve supply • Qualitative evaluations, such as letter grade for flexible aspects of generators

More Related