Southwest Power Pool Technical Workshop
180 likes | 356 Vues
Southwest Power Pool Technical Workshop. RTO_SS SPP’s RTO Electronic Scheduling System. Agenda. Introductions Review Agenda Overview and Current Status Data Exchange Contingency Plans User Training Questions. Agenda. Introductions Review Agenda Overview and Current Status
Southwest Power Pool Technical Workshop
E N D
Presentation Transcript
Southwest Power PoolTechnical Workshop RTO_SS SPP’s RTO Electronic Scheduling System
Agenda • Introductions • Review Agenda • Overview and Current Status • Data Exchange • Contingency Plans • User Training • Questions
Agenda • Introductions • Review Agenda • Overview and Current Status • Data Exchange • Contingency Plans • User Training • Questions
Overview and Current Status • Status as of March 7, 2001 • WebData to be Installed at SPP, March 14, 2001 • SPP Acceptance Testing Begins, March 19, 2001 • Unstructured User Testing Begins, April 9, 2001 • SPP User Training Sessions, April 11, 12, 2001 • RTO_SS Operational, May 1, 2001
Agenda • Introductions • Review Agenda • Overview and Current Status • Data Exchange • Contingency Plans • User Training • Questions
Data Exchange • Instantaneous Net Schedule • Calculated Once Per Minute • Includes all Schedules via NERC Tags • Includes ARS Assistance Schedules • Includes Ramp Calculations • Includes Loss Payback Schedules
Data Exchange • Instantaneous Net Schedule • Distributed to Control Areas via ICCP • Every Minute ? • By Exception ? • Discuss with Tech. Group • Viewable on RTO_SS GUI
Data Exchange • Net Schedule Interchange File • Configurable from current hour to next two hours • Breakdown by Minute • XML Format • Discuss methods for sending to members • HTTP Transfer to ARS with listener • HTTP Transfer to Member web listener • FTP Access Method
Data Exchange • OATI’s webData Product at SPP • Contains all schedule data locally to SPP • SPP Methods for Exporting sched data • OPS1 Web Access for Viewing/Download • Automated Procedures by SPP Staff based on User Needs • ODBC Backend Connectivity
Agenda • Introductions • Review Agenda • Overview and Current Status • Data Exchange • Contingency Plans • User Training • Questions
Contingency Plans • System Redundancy • Redundancy at OATI • Redundancy at SPP • ICCP Redundancy • Redundant Communication Access
Contingency Plans • What if ICCP link is down? • Data is still viewable from GUI • Other suggestions? • What if SPPNET is down? • Access RTO_SS via the Internet • What if OATI has major failure? • What if SPP has major failure? • Any other major points of failure?
Agenda • Introductions • Review Agenda • Overview and Current Status • Data Exchange • Contingency Plans • User Training • Questions
User Training Plans • SPP will work with OATI to accomplish User Training • Sessions TENTATIVELY scheduled for April 11 and April 12. • SPP will hold 2 separate sessions, with each being one day in duration • Locations to be announced
Agenda • Introductions • Review Agenda • Overview and Current Status • Data Exchange • Contingency Plans • User Training • Questions
Contacts at SPP: 501-664-0146 Barbara Gibson ext. 245 Aaron Ralls ext. 279 Kevin Perry ext. 251 www.spp.org