1 / 13

Company Background New Waste Framework Directive Waste maximisation Data security

Blackmore.IT : a re-use model. Company Background New Waste Framework Directive Waste maximisation Data security The Crazy Copper Carousel Caper. Background. Formed 1996 Trade Broker 2000 Service partner 2007 IT re-use centre 15 staff 20,000 sq ft facility near A303

Télécharger la présentation

Company Background New Waste Framework Directive Waste maximisation Data security

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Blackmore.IT: a re-use model Company Background New Waste Framework Directive Waste maximisation Data security The Crazy Copper Carousel Caper blackmore.it

  2. Background Formed 1996 Trade Broker 2000 Service partner 2007 IT re-use centre 15 staff 20,000 sq ft facility near A303 Clients inc. Dixons, Exeter Uni, Mitie, Serco, Barclays, Lombard and many more (including some here today) blackmore.it

  3. Waste Framework Directive WFD waste hierarchy blackmore.it

  4. Waste Framework Directive What must you do differently? You should consider what wastes you produce and how they are managed. The steps you will need to consider are; Using the waste management hierarchy You need to consider the hierarchy of waste management options. The hierarchy sets out, in order of priority, the waste management options you should consider. It places more emphasis on waste prevention, and then requires you to consider preparing waste for reuse, then opportunities for recycling, before options for recovery such as energy recovery and once all these other options have been explored, disposal. From 28 September 2011, whenever you pass waste on to someone else, you will have to declare on the waste transfer note, or consignment note for hazardous waste, that you have applied the waste management hierarchy. blackmore.it

  5. Waste maximisation T11 exempt: The purpose of this exemption is for the reuse of WEEE, or any dismantled components of WEEE, for their original purpose. It's about what it does not what it weighs. blackmore.it

  6. Waste maximisation Value based on weight (per ton): Metal £150 PCB £2500 Copper £4000 Cable £1500 Aluminium £2000 blackmore.it

  7. Waste maximisation Value based on weight (per ton): Metal £150 = 15p per kg PCB £2500 = £2.50 per kg Copper £4000 = £4 per kg Cable £1500 = £1.50 per kg Aluminium £2000 = £2 per kg blackmore.it

  8. Waste maximisation Value based on weight (per ton): Metal £150 = 15p per kg 6kg = 90p PCB £2500 = £2.50 per kg 1.2kg = £3 Copper £4000 = £4 per kg 250g = £1 Cable £1500 = £1.50 per kg 500g = 75p Aluminium £2000 = £2 per kg 100g = 20p TOTAL: 8.05kg = £5.85 £90 Total value as a refurbished PC? blackmore.it

  9. Waste maximisation blackmore.it

  10. Waste maximisation blackmore.it

  11. Data security Data Protection Act obligation Positive confirmation of destruction Certified with Professional Indemnity cover Inspected and approved by: Grant Thornton Ernst & Young Dixons Lombard Mitie Serco blackmore.it

  12. The Crazy Copper Carousel Caper China makes new PC + mains lead UK installs new PC Copper sent back to China Old PC recycled + new mains lead New mains lead sent for copper blackmore.it

  13. Blackmore.IT: a re-use model Try to re-use Be data safe Save money Increase employment Generate CSR funding THANK YOU blackmore.it

More Related