1 / 1
Cooperative Sun Project for Community Solar Expansion
10 likes | 98 Vues
Join Cooperative Sun's project managed by Doug Carter with a total cost of $625,000, funded by DOE with $500,000. The project involves tax equity, net metering, coop members' loans from RUS, FFB, CFC, etc., and different ownership models like SPE, lease, or inverted lease. Duration: 6-9 months.
Télécharger la présentation
Cooperative Sun Project for Community Solar Expansion
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
Control Number: 0923-1636 Cooperative Sun Doug Carter, Project Manager Total Project Cost $625,00 DOE Funding $500,000 Cost Share $125,000 Duration Months: 6-9 months Tax Equity Cooperative Sun Coop Net Metered Coop Members Loan: RUS, FFB, CFC, etc. Project SPE (Flip, Lease or Inverted Lease) Ownership Rights
More Related