PROCESS IMPLEMENTATION FOR Wabco Crank Case 911 905 0106 (ISB)

PROCESS IMPLEMENTATION FOR Wabco Crank Case 911 905 0106 (ISB) . Before modification - 1) Manually removes the unbaked sand at the center of core for plug. 2) Extra man power required for sand removing (2 no. of workers,125 no. of core produced.) 3) Inside core baking not properly. .

leanna
Télécharger la présentation

PROCESS IMPLEMENTATION FOR Wabco Crank Case 911 905 0106 (ISB)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROCESS IMPLEMENTATION FORWabco Crank Case 911 905 0106 (ISB)

  2. Before modification -1) Manually removes the unbaked sand at the center of core for plug.2) Extra man power required for sand removing (2 no. of workers,125 no. of core produced.) 3) Inside core baking not properly.

  3. Core Box core cavity Loose Piece Inserted Before Work. After Work. New loose piece inserted.

  4. After Modification. Manually removes the unbaked sand totally avoided Extra worker totally avoided. Totally 02 worker Saved Core required Quantity 500 nos produced & 8 workers Saved. Core weight reduced by 700 gm.Old Core Weight 2.720 Kg Modified Core Weight 2.0Kg

  5. Wabco Crank Case 911 905 0106 After Implementation Before Implementation

  6. Before Work After Work.

  7. Wabco Crank Case 911 905 0106 After Implementation Before Implementation