METAL LOSS IN-LINE INSPECTION SURVEYS

METAL LOSS IN-LINE INSPECTION SURVEYS. LIMITS AND INACCURACIES. BACKGROUND. Began use in 1960’s. Initial inspection tools were low resolution, low power tools. Suitable for finding where to look for corroded pipe. Better resolution and power offered in 1980’s.

lee-snider
Télécharger la présentation

METAL LOSS IN-LINE INSPECTION SURVEYS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. METAL LOSS IN-LINEINSPECTION SURVEYS LIMITS AND INACCURACIES

  2. BACKGROUND • Began use in 1960’s. • Initial inspection tools were low resolution, low power tools. • Suitable for finding where to look for corroded pipe. • Better resolution and power offered in 1980’s. • High resolution tools began use in late 1980’s. • Despite limitations and inaccuracies, pipelines began to calculate pressure limits based on in-line inspection grading in late 1990’s/early 2000’s.

  3. INACCURACIES IN PRESSURE LIMIT CALCULATIONS

  4. RUPTURES

  5. LEAKS

  6. High Resolution Inspection Tool Stated Limits and Inaccuracies • API 1160 • Inspection Company’s Specs

  7. API 1160 Limits onHigh Resolution Tools • Cannot detect or reliably detect: • Narrow axial external corrosion • Cracks and crack like defects • Laminations and inclusions • Pipe mill anomalies • Can detect, but cannot identify or size: • Dents, wrinkle bends and buckles • Gouges

  8. High Resolution PigSpec. Limitations • Cannot detect or unknown accuracy • Surface areas smaller than t x t • Axially oriented areas, width less than 2t • Areas interacting with weld, smaller than 3t x 3t • Minimum reported depth • For t x t to 2t x 2t, 0.4t • For larger than 2t x 2t, 0.2t • For larger than 3t x 3t, 0.1t • For areas interacting with weld, larger than 3t x 3t, 0.2t

  9. High Resolution PigSpec. Accuracy • Width and length • Isolated pits, +t • Complex shapes, +2t • Depth • For less than t x t, unknown • For t x t to 2t x 2t, +0.2t • For larger than 3t x 3t, + 0.1t • For areas interacting weld, 3t x 3t and larger +0.2t

  10. Case Study High Resolution Metal Loss Survey • 36 miles of pipeline • 695 metal loss anomalies deeper than 15% were reported • Breakdown on graded wall loss > 50% t 1 40 to 49% t 6 30 to 39% t 31 20 to 29% t 197 15 to 19% t 460

  11. Field Inspection Results • 200 anomalies were excavated • Detailed records produced on 11 pipe joints covering 62 anomalies • 90% of anomalies were deeper than graded • 58% of anomalies were longer than graded • 43 ungraded corrosion areas were found

  12. Ungraded Corrosion Areas • 20 to 68% deep • 0.25 to 25 inches long • 0.25 to 10 inches wide • Two exceeded RSTRENG

  13. Computer Display

  14. Computer Display

  15. Computer Display

  16. Computer Display

  17. Computer Display

  18. Needed Post Field Inspection Activities • Organize graded vs. found data • Regrade in-line inspection survey • New field inspection plan • Re-inspect and repair pipeline • Statistical analysis of areas not inspected • Apply future growth to anomalies

  19. Statistical Analysis of Non-Inspected Areas • Bayes Theorem • First applied on TAPS • Also called probability of exceedance (POE) analysis • Probability that an anomaly will exceed a given integrity criteria

  20. Non-Inspected Pipe POE Summary* POE %Number of Pipe Joints 20-29 5 30-39 3 40-49 4 50-59 7 60-69 2 70-79 5 80-89 3 90-99 1 * Exceeding RSTRENG without 10% surge allowance

  21. OPS Position Needed on POE Non-Compliance Limits • Probability to Exceed Part 192 or Part 195 • Per anomaly? • Per pipe joint? • Per pipeline section? • Per pipeline inspection survey? • Per pipeline system? • 1%, 2%, 5%, 10%, More?