1 / 5

2x250MW, TPP CSEB, KORBA (E)

2x250MW, TPP CSEB, KORBA (E). WELCOMES. HON'BLE CHIEF MINISTER OF CHHATTISGARH STATE. ON THE OCCASION OF BOILER LIGHT UP OF UNIT #1. DEVELOPED BY:- B. ADHIKARY, EE (IE). BOILER LIGHT UP UNIT #1 2X250 MW, TPP, CSEB, KORBA (E). OIL TANK. OIL LINE. BOILER.

lefty
Télécharger la présentation

2x250MW, TPP CSEB, KORBA (E)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2x250MW, TPP CSEB, KORBA (E) WELCOMES HON'BLE CHIEF MINISTER OF CHHATTISGARH STATE ON THE OCCASION OF BOILER LIGHT UP OF UNIT #1

  2. DEVELOPED BY:- B. ADHIKARY, EE (IE) BOILER LIGHT UP UNIT #1 2X250 MW, TPP, CSEB, KORBA (E) OIL TANK OIL LINE BOILER AIR LINE OIL PUMP WATER TANK COMPRESSOR CHIMNEY WATER LINE Flue Gas Duct DM PUMP ID Fan ELECTROSTATIC PRECIPITATOR FD Fan

  3. Fuel Firing System Coal/Oil Burner Coal/Air Mixture Atomized Oil water walls WIND BOX WINDBOX FURNACEFIRE BALL SA water walls water walls SA water walls Internal Combustion Boiler Corner Fired (Tangential)

  4. To IPT To IPT From HPT From HPT To HPT Drum Drum F S H F S H RH P L T S H P L T S H RH To Boiler Drum To Boiler Drum Prepared by:- B. Adhikary, EE (IE), KE W/W Platen Coal Burner LTSH Internal Combustion Boiler Wind Box ECO To atmosphere through chimney Hot SA APH-A Oil Guns APH BFP Cold SA ESP FD Fan ID Fan Flue gas exit

  5. Turbine 3000 rpm 400/220 KV Plant Layout 15.75KV 210MW Generator Transformer Generator 400/220 KV Switch Yard Chimney Condenser 2x250MW, Thermal Power Project CSEB, Korba (E) Prepared by: B Adhikary (I.E.) 5400C 147Kg/cm2 Induced Draft Fan ESP Flue Gas Duct F S H Coal Conveyer R H R H Pl S H Coal Bunkers Boiler Drum PSH Raw Coal Fdr Eco AH Coal Mills Coal Bunker CSEB Crusher House Hot PA Forced Draft Fan Cold PA Primary Air Fans Coal Handling Plant Boiler Boiler Feed Pump

More Related