NATIONAL SOLAR WATER HEATING (NSWH) PROGRAMME

NATIONAL SOLAR WATER HEATING (NSWH) PROGRAMME. Mr. Ompi Aphane DDG: Policy, Planning and Clean Energy Date: 11 August 2015. Outline. Historical Background Current Context (where are we now?) Strategic Context (where do we want to go?) Stakeholders

leggettj
Télécharger la présentation

NATIONAL SOLAR WATER HEATING (NSWH) PROGRAMME

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NATIONAL SOLAR WATER HEATING (NSWH) PROGRAMME Mr. Ompi Aphane DDG: Policy, Planning and Clean Energy Date: 11 August 2015

  2. Outline • Historical Background • Current Context (where are we now?) • Strategic Context (where do we want to go?) • Stakeholders • Conceptual Framework (how to get there?) • Summary: Re-focused by main objectives • Milestones and Deliverables

  3. Background (Historic) NSWH programme launched in 2010 • In 2008 Eskom was mandated to install 1 000 000 (1 million) systems under conditional grant, with the objectives to: a) reduce electricity demand and Green House Gasses (GHG) emissions; b) protect poor from electricity tariff increases; c) facilitate local manufacturing industry and create employment. • Outcomes achieved: • 400 000 systems installed in residential dwellings to date; • electricity reduction not achieved as focus has been in low electricity consumption areas; • imported products have dominated installations; • poor quality installations due to lack of training; • unreliable verification of number and location of installed systems due to lack of monitoring; • lack of maintenance of systems resulting in users reverting back to electric systems.

  4. Current Context (where are we now?) • Eskom’s mandate to implement the NSWH Programme has been terminated; • DOE has centralised and re-conceptualised the programme; • DoE re-focused on following main objectives • Socio-economic (jobs & access to hot water) • Energy (load reduction) • Industrialisation (local manufacturing capacity)

  5. Strategic Context (where do we want to go?) • Targeted system installations (1.8 million by 2020 – linked to budget allocation); • Financial resource requirements (R 400 million within DOE for current Financial Year + further allocations to be secured); • Obtain economies of scale through “standardised” systems, pricing and aggregated contracting modeland • Reduce energy consumption by about 55 GWh per month, which potentially can displace the use of expensive diesel to the extent of 12% every month.

  6. Strategic Context (where do we want to go?) • Socio-economicfocus • Subsidised new installations (low income) • Non-functional / old tube system replace with “new” ? • Energyfocus(load reduction) Aimed at existing and insured market segments via South African Insurance Industry and Banks: • Re-active: “faulty/failed” geyser to be replaced with Solar Geyser under insurance claim • Pro-active: existing functional electrical geysers to be replaced with Solar Geyser (SA Insurance Association (SAIA) + Banks) • Contributing further to National Development objectives: • Industrialisation / industry development (through Local Content requirements) • Job creation (through focused installation & maintenance training) • Sustainability (through life cycle management = operations & maintenance jobs)

  7. Strategic Context (where do we want to go?) • Envisaged governance framework: • Establishment of Programme Governance Steering Committee; • Partnerships across relevant national government departments and with Municipalities, e.g. • Identify and train installers in partnership with all relevant stakeholders; • Implementation of the dti designation of solar water heater tanks and collectors for local production; • Partnerships with government institutions, e.g. • SABS on manufacturing accreditation, local contenet and product verification; • Partnership with private sector to achieve programme objectives i.e. manufacturing of SWHs; financing relationship with SAIA and Banks • Sustainability through life cycle management of installed systems through monitoring and verification of installed systems

  8. Relevant stakeholders + Provinces, local authorities and communities in which installations are located

  9. Solar Water Heating Programme Conceptual Framework DoE Installation Agreement Supply Installation Delivery Storage Scheduling Service Level Agreement (DoRA type) Supply Agreement Supplier1 Suppliern ….. Munic1 Municm ….. • Feasibility • Stand exists • Structure type • Water available • Designated Areas • Social Facilitation SWH Systems 3 4 5 2 1 Verification (Independent) Installation + Life Cycle Technical Support (e.g. gIZ, Danish) . (SABS) Assurance (Construction SETA DoL DHE) Install Con Install Co1 ….. Accreditation SMME Support (e.g. SBD, IDC) Local Installers Trainees Training Agents Linked to broader IPP training programme(in overlapping locations) Placement Agreement Supplier Specific System Training / Accreditation Local Installers Labour Desk / Database - Includes Youth, Women, Veterans Flow of goods Governance Support Assurance Verification

  10. Summary: Re-focused by main objectives 2 Focus: Socio-economic (jobs & access to hot water) Focus: Energy (load reduction) DoE Subsidy Agreement MOU 3 2 1 1 3 Manufacturer / Supplier Insurers SAIA Re-active Implementation Agreement Supply Agreement Pro-active • Conditionality • Local content requirements • Verification requirements • “Standardisation” Focus: Energy (load reduction) Economies of Scale Building regulations New Buildings Government Buildings

  11. SUPPLIERS DoE SAIA MUNI DOE NSWH 2015/2016 – Window 1 High level work flow diagram FY 15/16 Q2 FY 15/16 Q3 FY 15/16 Q4 FY 16/17 Q1 Sep 15 Dec 15 Mar 16 Jun 16 Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Contractual framework with Municipality • Draft Framework and Service Delivery Agreement & Obtain BAC approval • Engage munics on rolling basis (prioritised) • Munics define geographical rollout Procurement of Suppliers/Manufacturers Current Funds committed • Draft RFP and agreements • BAC approval and Issue RFP • Evaluate Recommend and Approve Suppliers • Sign Implementation Agreement Procurement of Installers Current Funds committed • Draft RFP and agreements • BAC approval and Issue RFP • Evaluate Recommend and Approve Installers • Sign Implementation Agreement Current Funds committed SAIA • Obtain BAC approval for draft SAIA MOU & Subsidy Agreement • Finalise and sign MOU with SAIA • Sign Subsidy Agreement(s) with Insurance companies UIF Funding Training • Setting up and roll out of training programme • Selection of trainees Monitoring • System Development (gIZ) • Monitoring System Implementation Plan • Site Inspections (Pre and after and maintenance) • Evaluation reporting Current Funds committed + Other Departmental Contributions Programme support & development • Research, analytical, procurement, legal etc. Key Dependency Key Decision Points Milestone Points Other e.G DoL, SABS, gIZ INSTALLERS DHE

  12. Elements of the SWH programme requiring further investigation Technology Assessment Cost Benefit Analysis Industry CapacityAssessment Legislation & Policy Review Funding Investigation Landscape & Key Stakeholders Feasibility RiskAnalysis

  13. Way forward Obtain approval for SWH implementation plan discussed in presentation from Economic Sector, Employment and Infrastructure Development (ESEID) Cluster and Cabinet; The allocation for 2015/16 of R398 million to be divided between social, energy focus SWH systems and maintenance; Need to obtain approval to re-appropriate the un-spend Eskom funds to DOE; Implement and monitoring of roll-out programme by DOE, different Government departments and entities as proposed in presentation and To ensure that the main objectives of Socio-economic (jobs & access to hot water) Energy (load reduction) Industrialisation (local manufacturing capacity) are achieved.

  14. Thank you