1 / 25

EQUIPMENT CALCULATIONS

EQUIPMENT CALCULATIONS. SELECTION & SIZING. DETAIL REQUIRED FOR A PROJECT. COMPONENTS NEEDED FOR EVALUATION M & E BALANCE DATA EQUIPMENT COSTS OPERATING COSTS OTHER FACTORS. http://ecb.jrc.it/testing-methods/. SIMULATION DATA. ENERGY CONSUMPTION FOR ROTATING EQUIPMENT

Télécharger la présentation

EQUIPMENT CALCULATIONS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EQUIPMENT CALCULATIONS SELECTION & SIZING

  2. DETAIL REQUIRED FOR A PROJECT • COMPONENTS NEEDED FOR EVALUATION • M & E BALANCE DATA • EQUIPMENT COSTS • OPERATING COSTS • OTHER FACTORS http://ecb.jrc.it/testing-methods/

  3. SIMULATION DATA • ENERGY CONSUMPTION • FOR ROTATING EQUIPMENT • MECHANICAL EFFICIENCY DATA • THERMODYNAMIC EFFICIENCY DATA • HEAT TRANSFER DATA • APPROACH TEMPERATURES • TRANSFER COEFFICIENTS • MASS TRANSFER DATA • STAGE EFFICIENCIES • CAPACITIES • MOMENTUM TRANSFER • MINIMUM/MAXIMUM FLOW VELOCITIES AND/OR PRESSURE DROPS • TOTAL HEAD LOSS ESTIMATES http://www.mcnallyinstitute.com/06-html/6-01.html

  4. CAPITAL EQUIPMENT • TO ESTIMATE EQUIPMENT CAPITAL COSTS (REFER TO APPENDIX E – HUERISTICS FOR PROCESS EQUIPMENT DESIGN • DIMENSIONAL DATA • MASS • AREA • TYPES OF EQUIPMENT • HEAT EXCHANGE • PUMPS • REACTION • INVENTORY • PROCESS DATA • DESIGN PROCESS CONDITIONS • UTILITY REQUIREMENTS • MATERIALS OF CONSTRUCTION DATA http://www.geeco.co.uk/storagetanks.php

  5. INSTALLATION COSTS • SEE DETAILS IN CHAPTER 6 • RANGE OF COSTS TYPICALLY RUN FROM 4.7 TO 5.9 TIME EQUIPMENT (SEE TABLE 6-9) • COSTS DEPEND ON: • TYPE OF PROCESS, FLUID, SOLID OR MIX • MATERIALS OF CONSTRUCTION • LOCATION OF FACILITIES • SIZE OF PLANT • SEE COST ESTIMATOR AT PAGE xvi IN TEXT AND http://highered.mcgraw-hill.com/sites/0072392665/student_view0/cost_estimator.html

  6. TYPICAL ESTIMATE FACTORS

  7. CODES AND STANDARDS • HEAT EXCHANGER STANDARDS • THERMAL EXCHANGER MANUFACTURERS ASSOCIATION (TEMA) • TYPES R, B & C • SEE CHAPTER 14 FOR DETAILS • CONFIGURATION OF HEADS AND TUBES • NDE AND TESTING REQUIREMENTS • SUPPORT & INSULATION DATA • NOZZLE SIZES & LOCATIONS • ASME CODE REQUIREMENTS http://www.heatexchangersonline.com/images/index.jpg

  8. VESSEL DESIGNS • SEE CHAPTER 12 FOR DETAILS • NOZZLE DIMENSIONS & LOCATIONS • DESCRIPTION OF INTERNALS • SURFACE FINISHES • INSULATION REQUIREMENTS • CODE REQUIREMENTS - ASME OR API • FABRICATION & TESTING DATA http://www.ubh.co.uk/procves.htm

  9. VESSEL DESIGNS • TYPICAL LIMITS • PROCESS TANKS - 20% FREEBOARD • STORAGE TANKS - 10% FREEBOARD • PUMP TANKS - 5-10 MIN. SURGE • ACCESS NOZZLES FOR ALL INTERNALS • MINIMUM NUMBER OF WELDED SEAMS • MAXIMUM DIAMETER - 4 m FOR SHOP FABRICATION • HOLD POINTS AT FAB DRAWINGS, INSPECTION OF SHOP FAB STANDARDS, REVIEW OF NDE, PRESSURE TEST PRIOR TO PAINTING

  10. ROTATING EQUIPMENT • MOTOR OR TURBINE DRIVEN –CHAP. 12 • TOTAL PACKAGE - DRIVEN UNIT, DRIVERS, GEARS, COUPLINGS, SHAFTS, BELTS, BASES & SUPPORTS • GUARANTEE PERFORMANCE POINT - TO BE TESTED IN SHOP PRIOR TO SHIPMENT • TYPES OF BEARINGS & LUBRICATION • TYPES OF SEALS • NOISE LIMITS http://www.hydrocarbons-technology.com/contractors/compressors/elliott/

  11. PUMPS • LOW HEAD/HIGH FLOW - RADIAL, CENTRIFUGAL, NOT SELF-PRIMING • HIGH HEAD/LOW FLOW - TURBINE, POSITIVE DISPLACEMENT • INSTALLATION CONFIGURATION - HORIZONTAL, VERTICAL, INLINE, SUBMERGED, JACKETED, SINGLE OR MULTI-STAGE • MINIMUM NPSH • NORMAL DISCHARGE P • STANDARD CASINGS • MACHINED IMPELLERS http://www.arrowengine.com/chemical.htm

  12. http://usdidactic.com/refpdf/gunt/04062000%202.pdf. COMPRESSORS • SMALL UNITS ARE TREATED LIKE PUMPS • DYNAMIC AND TORSIONAL ANALYSES FOR THE TRAIN • 1ST CRITICAL - SEVERE STRESS • 2ND CRITICAL - NOT AS BAD • 3RD CRITICAL - RELATED TO 1ST BUT NOT AS BAD • HIGHER VALUES - NOT NORMALLY CONSIDERED

  13. COMPRESSORS • FOR LARGER UNITS • VIBRATION MONITORS • ALARMS • SHUTDOWN CIRCUITS • LOCAL CONTROL PANELS http://www.nt.ntnu.no/users/lovland/SIK3035/pictures/compress.htm

  14. COST CALCULATIONS • DETAIL AND SOURCE DEPEND ON LEVEL OF ESTIMATE REQUIRED (FIGURE 6-4) • FEASIBILITY - OUTLINE SPECIFICATION • QUOTATION - COMPLETE SPECIFICATION • BUDGET - AWARDED CONTRACT • COSTS IN TEXT ARE BASED ON 2002 DATA • COST ESTIMATES ON WEB SITE MAY BE MORE CURRENT • COSTS IN SUPERPRO ARE MORE CURRENT • VENDOR DATA IS CURRENT BUT MUST BE VERIFIED – WRITTEN OR E-MAIL QUOTE

  15. COST ADJUSTMENTS • SCALE-UP FACTORS DEPEND ON • TYPE OF EQUIPMENT • SIZE OF EQUIPMENT • CATALOG VERSUS CUSTOM EQUIPMENT • SEE TABLE 6-4 FOR TYPICAL EXPONENT VALUES • MATERIALS OF CONSTRUCTION

  16. COST SCALE-UP DUE TO TYPE OF EQUIPMENT • FLUID FLOW EQUIPMENT SCALES UP BY 0.67 WHICH IS THE RATE THE AREA OF THE PIPE INCREASES WITH VOLUME • EQUIPMENT LIKE HEAT EXCHANGERS • HAVE FIXED COSTS FOR HEADS • VARIABLE COSTS FOR TUBES (AREA) • ROTATING EQUIPMENT DRIVE MOTORS COSTS VARY BY VOLTAGE

  17. http://www.iit.edu/~smart/garrear/fuelcells.htm TYPICAL FACTORS IN COST SCALE-UP FOR FACILITIES • MATERIALS OF CONSTRUCTION • SS TYPICALLY THREE TIMES CARBON STEEL • SEE FIGURE 12-41 FOR OTHERS • PRESSURE AND TEMPERATURE • AS PER FIGURE 14-15 • ALSO MAY CHANGE CODE REQUIREMENTS • EXAMPLE FOR SOLID OXIDE FUEL CELL STACK IS ON THE NEXT SLIDE

  18. SOFC SCALE-UP EXAMPLE www.netl.doe.gov/publications/proceedings/06/seca/pdf/Thijssen.pdf

  19. SCALE-UP FOR INFLATION • INFLATION - USE M&S OR CHEMICAL ENGINEERING INDICES • VALUES ARE AVAILABLE IN CHEMICAL ENGINEERING MAGAZINE • SEE TABLE 6-2 FOR INDICES THROUGH 2002

  20. MARSHALL & SWIFT INDEX • CHEMICAL ENGINEERING MAGAZINE, DEC 2006

  21. CHE PLANT COST INDEX (CEPCI) • CHEMICAL ENGINEERING MAGAZINE, DEC 2006

  22. CURRENT BUSINESS INDICATORS • CHEMICAL ENGINEERING MAGAZINE, DEC 2006

  23. DATA SOURCES – VENDOR INFORMATION • EQUIPMENT VENDORS CAN BE VALUABLE SOURCES OF DATA • FEASIBILITY PROJECTS • RECOMMEND TYPES OF EQUIPMENT BASED ON PROCESS REQUIREMENT • PROVIDE DATA FOR OUTLINE SPECIFICATIONS • PROVIDE COST & SCHEDULE DATA • PROVIDE OUTLINE DIMENSIONAL & UTILITY DATA

  24. VENDOR SUPPORT • PROJECT EVALUATION • EXAMPLES OF SIMILAR EQUIPMENT INSTALLATIONS • ACCURATE COST DATA FOR ESTIMATE • ACCURATE UTILITY DATA FOR DESIGN • ACCURATE OUTLINE DRAWINGS

  25. VENDORS AS CLIENTS • PROJECT AUTHORIZATION AND FINANCING • HARD MONEY QUOTATION • WITH AWARD • ALL DESIGN DATA NEEDED FOR INSTALLATION • ALL INTERFACE DATA • DETAILED FABRICATION, TESTING & DELIVERY SCHEDULE • DETAILED CASH FLOW SCHEDULE • QUALITY CONTROL DATA

More Related