Prepare for station five construction by bundling fibers, aligned trimming, and connectorization with quality assurance. Bridge and bridge-ready for connectorization process guidance, with fiber radius guide and QA images. Conduct LED survey, lens optics preparation, and urgent station connector tasks.
Fiber Optic Station Five Preparation and Connectorization Tasks
E N D
Presentation Transcript
Preparation for station five Construction/bundling/connectorisation
Bundling • New comb ready:Comb in use • Fibres trimmed on rubber sheet with cutter knife:- align centre fibre on horizontal white line- trim fibres along vertical white line QA image for one connector (# of fibres in a bundle) Polished surface Cut surface
Connectorisation • Bridge ready:Bridge in use • Fibre radius guide during connectorisation QA image for one connector (# of fibres in a hole)
Light source • LED survey finished:EG-5UV405-15 from ETG Inc.- Peak 405 nm, range 400-410 nm- 12 mW outputnow in hand. • Optics:- spherical lens for collimation is ready- cylinder lens for focusing is ready- preparing mount for lens- needs mechanical slits
Mechanical • Connector:patch-panel connector for external waveguide revised to have gland • URGENT:- go-nogo gauge to be made- station connectors to be made • Carbon-fibre station- needs to be machined for connector holes • Doublet-layer- want the first doublet-layer as soon as it is ready so that we can start work during manufacturing of the second/third doublet-layers. • That’s all!