An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Introduction to W7-XCoil Testing at CEA – Saclay, France G.Croari – March 2008

  2. G.Croari – March 2008 Outline • Test facility description • Coil test procedure • Main difficulties • Conclusion

  3. G.Croari – March 2008 Outline • Test facility description • Coil test procedure • Main difficulties • Conclusion • Cryostats, valve boxes, satellite • Power supply • Pumping system • Cryogenic part (Refrigerator/liquifier) • Data acquisition system

  4. G.Croari – March 2008 Outline • Test facility description • Coil test procedure • Main difficulties • Conclusion • Cryostats, valve boxes, satellite • Power supply • Pumping system • Cryogenic part (Refrigerator/liquifier) • Data acquisition system • Documentation • Incoming Inspection tests • Coils into cryostat • Outgoing check

  5. G.Croari – March 2008 Outline • Test facility description • Coil test procedure • Main difficulties • Conclusion • Cryostats, valve boxes, satellite • Power supply • Pumping system • Cryogenic part (Refrigerator/liquifier) • Data acquisition system • Documentation • Incoming Inspection tests • Coils into cryostat • Outgoing check • DC test • Leaks • Detail of some coils

  6. G.Croari – March 2008 Outline • Test facility description • Coil test procedure • Main difficulties • Conclusion • Cryostats, valve boxes, satellite • Power supply • Pumping system • Cryogenic part (Refrigerator/liquifier) • Data acquisition system • Documentation • Incoming Inspection tests • Coils into cryostat • Outgoing check • DC test • Leaks • Detail of some coils • My contribution

  7. G.Croari – March 2008 1. Test Facility Description • Cryostats, valve boxes, satellite • Power supply • Pumping system • Cryogenic part (Refrigerator/liquifier) • Data acquisition system

  8. G.Croari – March 2008 Test Facility DescriptionCryostat, Valve boxes, Satellite Cryostat 1 Valve box C 1 Satellite Valve box C 2 Cryostat 2 TestFrames

  9. G.Croari – March 2008 Test Facility DescriptionCryostat, Valve boxes, Satellite Satellite Valve box C 1 Valve box C 2 Power Supply terminals

  10. G.Croari – March 2008 Test Facility DescriptionCryostat, Valve boxes, Satellite Cryostat detail Connections for Coil A NitrogenShield Connections for Coil B

  11. G.Croari – March 2008 Test Facility DescriptionCryostat, Valve boxes, Satellite Valve box detail Current leads

  12. G.Croari – March 2008 Test Facility DescriptionCryostat, Valve boxes, Satellite Valve box detail Valves

  13. G.Croari – March 2008 Test Facility DescriptionCryostat, Valve boxes, Satellite Valve box detail Cablings Safety Valves Calibration Leak

  14. G.Croari – March 2008 Test Facility DescriptionPower Supply Input: 380 Vac 3-phase Simplified schematic Transformer Thristors Iout Load

  15. G.Croari – March 2008 Test Facility DescriptionPower Supply • Input: • Max absorption 980 A • Nominal Power 700 KVA • Water cooled • Output: • Max current 25KA • Max Voltage 10V • Regulation: • <+-10 E-4 on inductive Loads • <+-10 E-3 on resistive Loads

  16. G.Croari – March 2008 Test Facility DescriptionPumping System

  17. G.Croari – March 2008 Test Facility DescriptionPumping System Primary system

  18. G.Croari – March 2008 Test Facility DescriptionPumping System Secondary system

  19. G.Croari – March 2008 Test Facility DescriptionPumping System Primary system Secondary system Root pumps Vane pump Diffusion pump

  20. G.Croari – March 2008 Test Facility DescriptionCryogenic part: Refrigerator / Liquifier Cold Box Nitrogen Exchanger Heat Exchanger Turbine Cold Helium

  21. G.Croari – March 2008 Test Facility DescriptionCryogenic part Refrigerator / Liquifier • Specifications of cold part: • Total mass flow rate 15 + 31 gr/sec LHe @ 300 K • Refrigerating power = 200W @ 4,2 K • LHe production = 70 Lt / hour 5000 Litres LHe tank

  22. G.Croari – March 2008 Test Facility DescriptionData Acquisition System Coils & Test Facility Coils

  23. G.Croari – March 2008 Test Facility DescriptionData Acquisition System Measurement on coils: • Temperature sensors • Strain Gauges • Extensometer

  24. G.Croari – March 2008 Test Facility DescriptionData Acquisition System

  25. G.Croari – March 2008 2. Coil Test Procedure • Documentation • Incoming Inspection tests • Coils into cryostat • Outgoing check

  26. G.Croari – March 2008 Coil test procedureDocumentation • Scope and Requirements

  27. G.Croari – March 2008 Coil test procedureDocumentation • Scope and Requirements • Documentation

  28. G.Croari – March 2008 Coil test procedureDocumentation • Scope and Requirements • Documentation • Non Conformrmity Report

  29. G.Croari – March 2008 Coil test procedureIncoming Inspection Tests • Unloading from the lorry

  30. G.Croari – March 2008 Coil test procedureIncoming Inspection Tests • Unloading from the lorry • Installation under a test frame

  31. G.Croari – March 2008 Coil test procedureIncoming Inspection Tests • Unloading from the lorry • Installation under a test frame • Bending and Joint box installation

  32. G.Croari – March 2008 Coil test procedureIncoming Inspection Tests • Unloading from the lorry • Installation under a test frame • Bending and Joint box installation • Cablings and tests: Temperature sensors, Strain gauges, Extensometers

  33. G.Croari – March 2008 Coil test procedureIncoming Inspection Tests • Unloading from the lorry • Installation under a test frame • Bending and Joint box installation • Cablings and tests: Temperature sensors, Strain gauges, Extensometers • QD Wire check, DC insulation test

  34. G.Croari – March 2008 Coil test procedureCoils Into Cryostat • Coil at open cryostat: QD wire check, DC test

  35. G.Croari – March 2008 Coil test procedureCoils Into Cryostat • Coil at open cryostat: QD wire check, DC test • Under Vacuum: Leak test Calibration leak Coil leak

  36. G.Croari – March 2008 Coil test procedureCoils Into Cryostat • At open cryostat: QD wire check, DC test • Under Vacuum: Leak test • Coils at cryogenic temperature: Current test, AC test, DC test

  37. G.Croari – March 2008 Coil test procedureCoils Into Cryostat • At open cryostat: QD wire check, DC test • Under Vacuum: Leak test • Coils at cryogenic temperature: Current test, AC test, DC test AC test is to test the interlayer insulation

  38. G.Croari – March 2008 Coil test procedureCoils Into Cryostat • At open cryostat: QD wire check, DC test • Under Vacuum: Leak test • Coils at cryogenic temperature: Current test, AC test, DC test DC test is a general check of insulation

  39. G.Croari – March 2008 Coil test procedureOutgoing check • Before shipment: QD wire check • Outgoing check

  40. G.Croari – March 2008 3. Main Difficulties • DC test • Leaks • Detail of some coils

  41. G.Croari – March 2008 Main DifficultiesDC Tests Coil Arrival Coil Departure Room T Cryo T After warm up

  42. G.Croari – March 2008 Main DifficultiesDC Tests Coil Arrival Coil Departure Room T Cryo T After warm up If it failed at Cryo T It fails at room T too 100% OK about 70% Not OK about 30% OK

  43. G.Croari – March 2008 Main DifficultiesDC Tests DC test failures: possible explanations In the coil In the test facility • Ground Insulation • QD wires • Cryostat connections • Hydraulic connections • Holding system

  44. G.Croari – March 2008 Main DifficoultiesDC Tests • Critical points on the coil: • Ground Insulation

  45. G.Croari – March 2008 Main DifficultiesDC Tests • Critical points on the coil: • Ground Insulation

  46. G.Croari – March 2008 Main DifficultiesDC Tests • Critical points on the coil: • Ground Insulation • QD Wires

  47. G.Croari – March 2008 Main DifficultiesDC Tests • Critical points on the test facility: • Cryostat connections (QD bucket)

  48. G.Croari – March 2008 Main DifficultiesDC Tests • Critical points on the test facility: • Cryostat connections (QD bucket) • Hydraulic connections Internal view of a valve box

  49. G.Croari – March 2008 Main DifficultiesDC Tests • Critical points on the test facility: • Cryostat connections (QD bucket) • Hydraulic connections • Holding system

  50. G.Croari – March 2008 Main DifficoultiesLeaks Coils Test facility AAB10 welding during current test (03/08/2007) Valve box potential breaker (28/03/2007)