1 / 4

Panel Discussion: Proposed Changes to the ASO

Panel Discussion: Proposed Changes to the ASO. Why do we need the Order?. Provides valuable guidance and structure Topically: Shielding policy, interlocks Depth: Safety Analysis 835 0 pages 420 IG 6 pages 830 IG 48 pages. What value does the Order bring?. Tool

Télécharger la présentation

Panel Discussion: Proposed Changes to the ASO

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Panel Discussion:Proposed Changes to the ASO

  2. Why do we need the Order? Provides valuable guidance and structure • Topically: • Shielding policy, interlocks • Depth: • Safety Analysis • 835 0 pages • 420 IG 6 pages • 830 IG 48 pages

  3. What value does the Order bring? Tool • Meant to be used, not followed • Allows for standardized approach, but different outcomes • Risk analysis, USI, credited controls

  4. Alternatives • The Order/Guide are the proper instruments • Any other alternative will: • Create gaps (835, 851, external) • Be excessive (830) • Ultimately, will not reduce burdens on DOE or contractors

More Related