1 / 8

Capability Development Group

Capability Development Group. Brigadier Kathryn Toohey – DGICD. Integrated Capability Development (ICD) Branch. Mission JFID is to assist project managers in identifying and managing joint integration requirements IOT enable the delivery of integrated and coherent Joint Force capabilities .

lester-hunt
Télécharger la présentation

Capability Development Group

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Capability Development Group Brigadier Kathryn Toohey – DGICD

  2. Integrated Capability Development (ICD) Branch

  3. Mission JFID is to assist project managers in identifying and managing joint integration requirementsIOT enable the delivery of integrated and coherent Joint Force capabilities. Integration by design System of systems Focus on C4, BA and Log Integration Joint Force Integration Directorate (JFID)

  4. Proposed JFID Integration Framework • Level 3 (Portfolio-DCP) • Enterprise architecture for C4 and BA • Identification and enforcement of common standards for C4, BA and Log • Level 2 (Program-DOEF) • Umbrella OCD set based on DOEFs • Identification of program level needs • Consistent environmental scan to form the basis for project OCDs • Level 1 (Project) • Risk based approach: Project Integration Needs Studies (PINS) Part 1 and Part 2 and Project Integration Risk Assessments (PIRA) • Identification of Joint C4, BA and Log opportunities during project initiation

  5. JP2072 L75-4 CA52 (Pers Eqpt) L116-3.2 CA15 (Chinook) CN17 (Tobruk) JP2048 CAF06 (C130) L121-3B C2 C2 C2 C2 C2 C2 C2 C2 C2 Scheduling risks Common Veh Architecture BA BA BA BA BA BA BA BA BA Common Veh Architecture Avail of systems for test Require Link 16 Log Log Log Log Log Log Log Log Log Availability of diesel Air Transportability Air transportability Trailers Soldier system undefined Common Veh Architecture Sea transportability Integration Risk Summary Extreme 0 High 1 Medium 5 Low 5 Project Integration – Risk Assessments Projects In-Service fleets Joint LD Branch L121-4

  6. Program Integration – Umbrella OCDs Aim To identify program/ DOEF level needs and requirements • Intent • Guidance to PMs on integration design factors • HCS endorsed V1.0 in Dec 13 • Seeking feedback on V1.0 in advance of release of V2.0 in mid 14 12 x UOCD Groupings

  7. Defence Committee Chief of Service Committee Joint Warfare Council Governance Influence Strategic Guidance Joint Concepts DOEF Enterprise Architecture Standards • Joint Force Integration & • Interoperability Requirements • Umbrella OCDs (JFID) • PINS Part 1 and Part 2 (if required) (JFID) • PIRA (if required) (JFID) • Operational Concept Documentation (Project Manager) • Function & Performance Specification (FPS) (PM) • Test Concept Documentation (TCD) (PM) • Linkages & Dependencies (PM with input from JFID) • Risks & Issues (PM) Capability Needs Statement Project Document Suite CGRB First Pass CGRB Second Pass PIRB-I Portfolio Integration – “Integrating the Integrators” Level 3 Level 2 Level 1

  8. Questions?

More Related