1 / 5

SANDHURST COMPETITION 2013

SANDHURST COMPETITION 2013. Rope Bridge Concept. Range Layout. FLA/CCP. 2x OE-254 antennas. Incoming Traffic. Outgoing Traffic. Team Briefing Area. Lane 1.

Télécharger la présentation

SANDHURST COMPETITION 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SANDHURST COMPETITION 2013 • Rope Bridge Concept

  2. Range Layout FLA/CCP 2x OE-254 antennas Incoming Traffic Outgoing Traffic Team Briefing Area Lane 1 Mission: Squads, utilizing squad, and given equipment, cross the gap as indicated by your lane walker. All members of the squad and assigned Casualty are to cross the gap, with all equipment utilized transferred to the far bank, and recover the rope bridge.

  3. Scoring • Constraints: • No civilian pulley system or civilian harness will be used to construct the rope bridge. • Only one person attached to the bridge at any one time. • Only the first and last squad member may enter the gap/water while the bridge is anchored at one point. They must be attached to the bridge or a safety line whilst conducting the transit. • The rope bridge must be clear of the water, allowing a crossing without contact with the water. • Two anchor points must be established (one on the far side and one on the near side). • The rope on the far side anchor point must be wrapped around the tree a minimum of four times (4 wraps of rope visible from the opposite side of the tree). • All equipment utilized will be recovered to the far bank. • Each team member must be supported by a Swiss seat through which the team member is attached to any rope with a screw gate karabiner. • The Swiss seat will be tied and rigged only when the team arrives at the rope site. The team must be visually inspected prior to building the rope bridge. • Squad members must use a karabiner with a screw gate, the screw gate must be closed prior to movement. • Each squad member must wear a helmet (ACH or Kevlar) and leather gloves while conducting the crossing. • The time of the rope bridge starts once the first person enters the gap/water and ends once the last person exits the water/gap. Penalties : • Loss of equipment in transit + 30 seconds each • More than one person crossing at any one time + 5 minutes each • Far side anchor does not have a minimum of 4 wraps of rope around the tree + 7 minutes • Improper Swiss Seat (Individual is held until deficiency is correct at the staging area) • Personnel/Equipment who contact the water will start again from the home bank

  4. Manning • OIC: CPT Pendergraft • 2IC: CPT Smith • Safety: CPT DMI Officer/NCO • FLA with 2 Medics: TBD Total Cadets Needed: 24 cadets total including CIC/ACIC • CIC: CDT (TBD) • ACIC: CDT (TBD) • Cadet Staff: • In-brief/Holding area: CIC, 2 cadet • Record Keeper: A/CIC, 2 cadet • Time Keeper: 2 cadets (1 near/ 1 far) • Rope lanes: 8 cadets • VIP Team: 2 cadet • Spectator/Crowd Control/Road Guard: 2 cadets • 4 Rotating Cadets to replace Rope lane Cadets

  5. Questions

More Related