1 / 8

Mate Competition 2013

Mate Competition 2013. Task 1 steps 1-5. Step 1. 5 pts - Transfer the SIA (Scientific Interface Assembly) to the seafloor . Step 2. 20 pts – Installing the SIA (Scientific Interface Assembly) so it rests completely within the BIA (Backbone Interface Assembly). Step 3.

val
Télécharger la présentation

Mate Competition 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mate Competition 2013 Task 1 steps 1-5

  2. Step 1 5 pts - Transfer the SIA (Scientific Interface Assembly) to the seafloor

  3. Step 2 20 pts – Installing the SIA (Scientific Interface Assembly) so it rests completely within the BIA (Backbone Interface Assembly)

  4. Step 3 5 pts – Removing the CTA (Cable Termination Assembly) from the seafloor

  5. Step 4 20 pts – Inserting the CTA from the bulkhead connector on the BIA Not this kind of CTA

  6. Step 5 10 pts – Pulling the pin to release the OBS (Ocean Bottom Seismometer) from the elevator. Pull me!! Elevator OBS PIN!!!

  7. Step 5 10 pts – Pulling the pin to release the OBS (Ocean Bottom Seismometer) from the elevator.

  8. Step 5 10 pts – Pulling the pin to release the OBS (Ocean Bottom Seismometer) from the elevator.

More Related