80 likes | 197 Vues
This update covers the latest developments regarding the Phase 2 Technical Proposal (TP) for CMS enhancements. Key discussions include the R&D program concerns raised by LHCC, duplication of efforts with ATLAS, and preparations for the upcoming meetings on February 3 and March 4. A new forum and workshop are being established to facilitate collaboration. Important updates on the status of muon preparations are shared, along with drafts, timelines, and outlines. The focus remains on enhancing performance, longevity, and project planning for Phase 2.
E N D
General news I • Update on progress for TP: • 2 slides follow to be shown at USG02 (Upgrade Steering Group) Monday 27 Jan at 16:00 (1 hr ago, https://indico.cern.ch/conferenceDisplay.py?confId=297597) … comments + time machine? • LHCC has concerns about R&D program for Phase 2 • Uncovered areas? • Duplication of effort between CMS & ATLAS? • Has asked for presentations at March 4 meeting • See USG01 https://indico.cern.ch/conferenceDisplay.py?confId=294535 • Therefore, upgrade management is conducting an R&D survey: • Information to be gathered by JH before USG meeting of Feb. 3 (1 week!). • Template for information attached to the agenda (Phase2_R&D_template_JM_DC.docx). • U.S. R&D proposals submitted for 2014, no decisions • Others – please let me know, even verbally, ASAP! European AIDA 2 proposals?
General news II • Upcoming: all-day “kickoff” workshop on Thursday Feb. 6, on the topic “Upgrade TP Performance Studies: • https://indico.cern.ch/conferenceDisplay.py?confId=293230 • Alexei Safonov will give the 15’+5’ muon talk • New Hypernews forum “Upgrade Technical Proposal Performance Studies”, you are invited to subscribe • https://hypernews.cern.ch/HyperNews/CMS/get/upgrade-tp-studies.html • Planning for Karlsruhe Upgrade Week going on • Website open but lacking important info (https://indico.cern.ch/conferenceDisplay.py?confId=294765) • Draft schedule – next slide
When to have muon parallel session? How much time needed? Attendance from muon community? Draft Karlsruhe schedule
Update on muon preps. for the Phase 2 TP • TP muon editing group • Editor JH, contact persons: • Consolidation of existing: Cristina DT, Armando CSC, Gabriella RPC • Simulation: Anna Colaleo, Alexei Safonov • New detectors: Archana, Marcello Abbrescia • Electronics: Paul Aspell • Integration into CMS and infrastructure, costing: TBD • Current status of muon work • Twiki page https://twiki.cern.ch/twiki/bin/viewauth/CMS/HLLHCmuonPhase2 • Detailed outline of TP created and put into the official draft • R&D proposals being hatched, much simulation work going on, technical questions being addressed
Expectations for first draft of TP muon section • Draft ~2 weeks • Text available from ECFA, RRB: can put something in ~4 weeks • May take ~2 months Briefly: • Intro • Longevity of existing • Performance estimates • GE1/1 and GE2/1 • RE3/1 and RE4/1 • ME0 behind rebuilt HE • Infrastructure • Project planning • Costing
Recap: the Phase 2 muon plans Three main aspects: • Aging studies, replacement • GIF++ tests for CSC and RPC chamber aging, DT components • Freon replacement for RPC gas after LS3 • DT minicrate replacement • Forward muon trigger and redundancy • GE1/1 and GE2/1 based on improved L1 trigger, redundancy in the most intense region • RE3/1 and R4/1: timing for background rejection and PU mitigation • Forward muon tagging extension (ME0) • Large eta coverage (~2.1-4.0) for big acceptance, S/N boosts in modes with muon • Hermeticity for modes excluding muons
High Rapidity Muon (HRM) layout • Proposed at ECFA workshop