1 / 9

Power Management Technical Working Group Structure and Goals

Power Management Technical Working Group Structure and Goals. M. S. Tillack and A. R. Raffray. ARIES Project Meeting 14-15 June 2007. The TWG’s play a key role in the ARIES Pathway Study. Decision to commercialize fusion. Parametric trade studies. External advisory committee. 2. 1.

lgauthier
Télécharger la présentation

Power Management Technical Working Group Structure and Goals

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Power ManagementTechnical Working Group Structure and Goals M. S. Tillack and A. R. Raffray ARIES Project Meeting 14-15 June 2007

  2. The TWG’s play a key role in the ARIES Pathway Study Decision to commercialize fusion Parametric trade studies External advisory committee 2 1 TWG’s: Power management Tritium management Plant operations T W G R&D needs and priorities Design requirements 3 4 Tokamak line of R&D Experimental power reactor 5 ARIES-AT Demo ARIES-AT Nuclear tokamaks ITER ARIES Study Outcomes: 1. Guidelines for fusion development 2. Sensitivity study results 3. R&D planning document 4. Preconceptual design requirements 5. Preconceptual design report Non-nuclear tokamaks Other R&D and facilities

  3. Our goal is to translate advisory committee recommendations into design requirements and an R&D plan Mission Customer Needs Requirements Present Database Reactor Conceptual Design Issues & R&D Needs R&D Implementation The “ARIES Process”

  4. The Power Management TWG has been populated • Mark Tillack (R&D plan leader) • René Raffray (design requirements leader) • Don Steiner • Said Abdel Khalik • Siegfried Malang • Plasma expert tbd

  5. Mission Statement • Demonstrate fusion energy production and utilization, including: • power and particle handling • extraction of power core high-grade heat • power conversion • nuclear performance of in-vessel and ancillary equipment

  6. Pinjected Systems approach to power management In-vessel components Plasma Blanket Pn Cooling Pfusion First wall, PFC’s Prad,chamb frad Pa 1-frad Divertor frad,div Prad,div Pdiv Pcond 1-frad,div Power conversion Creating fusion energy… … for the production of electricity

  7. R&D Needs and Priorities Subgroup – Approach and Tasks – • Document the current status of R&D • In the US • Worldwide • Characterize the R&D gaps • To a power plant • To a CTF/Experimental power reactor • Develop R&D plans and options

  8. Technical Design Requirements Subgroup – Approach and Tasks – • Establish scaling metrics and goals • Define device characteristics • Define device parameters • Define operating scenarios and test program • Exploration of parameter space • Demonstration of controllability • Etc.

  9. TWG Schedule Jun 2007 Sep 2007 Dec 2007 Mar 2008 Jun 2008 Sep 2008 TWG planning UAC mtgs Formulation of requirements Definition of requirements Conceptual design activity Conceptualdesign process R&D existing status and needs R&D plans/options R&D planning Final reports Documentation

More Related