1 / 30

Change Management

Change Management. Igal Kaptsan Research Director Applied Research, Bentley Systems. Topics. What is change management? Infrastructure Project Challenges Tie Design Phase to Project Lifecycle Change Management building blocks. What is change management?.

lilia
Télécharger la présentation

Change Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Change Management Igal Kaptsan Research Director Applied Research, Bentley Systems

  2. Topics • What is change management? • Infrastructure Project Challenges • Tie Design Phase to Project Lifecycle • Change Management building blocks

  3. What is change management? Change Management is about detecting changes and initiating appropriate responses to them.

  4. Infrastructure Project Challenges • Project teams include many participants from multiple companies from any part of the world with varying project delivery methods and contractual relationships • Each project has a unique and transient supply chain that comes together quickly, exists for a few years and the dissolves at the conclusion of the project. • Impossible to implement a single “system” for the all the functions of the entire supply chain. • Identifying, communicating and measuring the impact of change, which is at the heart of all projects, is problematic. • Reusing designs and design projects from past projects is difficult.

  5. Infrastructure Project Challenges • Changes are inevitable in infrastructure projects and are likely to occur from different sources, by various causes, at any stage of a project - and may have considerable impacts • There are diffident types of changes: • Elective or required • Discretionary or non-discretionary • Preferential or regulatory • This makes it imperative to have in place an effective change management regime in place However, it is impossible to effectively manage change if there is no reliable model that captures the dependency between the key project elements

  6. Tie Design Phase to Project Lifecycle Plan Requirements Concept Design / Implementation Construction Verification & Validation Operation & Maintenance Project Scope Requirements Capture and Management Detailed design Verification and Validation Design/Construction Variations Construction Work Packages Design is not a discrete activity. To achieve a full dependency model all phases need to be linked to each other and be aware of any changes done in any one of them at any point of time.

  7. Change Management building blocks Content definition & extraction Dependency viewing & authoring Identify & coordinate changes Rules driven Notifications Actions & Workflow

  8. Documents Content extraction & definition Content definition & extraction Dependency viewing & authoring Identify & coordinate changes Rules driven Notifications Actions & Workflow ProjectWise Document Management

  9. Behavior links Behavior links Behavior links Testing Trade-off study Analysis Documents ProjectWise Document Management

  10. Content extraction & definition Document Management MS Excel MS Word ProjectWise Dependency Service CAD Model MS PowerPoint MS Project CAD Model

  11. Dependencies viewing & authoring • Existing dependencies • Reference files • Link Sets • Sets of Documents • Dependency authoring Content definition & extraction Dependency viewing & authoring Identify & coordinate changes Rules driven Notifications Actions & Workflow

  12. Existing Dependencies Viewing Root Link Set Application driven Filter Office Docs References

  13. Existing Dependencies Viewing Electrical… Architecture … Electrical + Architecture

  14. Impact analysis Affected by Affecting Existing Dependencies Viewing

  15. Dependencies between what? • Existing dependencies • Reference files • Link Sets • Sets of Documents • Dependency authoring • Objects • Documents • Content

  16. Capture, Apply and Assess risk - Activity Management

  17. Daily Cost Monitoring Labor and equipment costs are estimated at beginning of the project. These estimated costs need to be validated against the actual project tracking document for labor and equipment costs.

  18. Identify & monitor changes Content definition & extraction Dependency viewing & authoring Identify & coordinate changes Rules driven Notifications Actions & Workflow

  19. Identify & monitor changes Document Management MS Excel MS Word ProjectWise Dependency Service Content definition & extraction Dependency viewing & authoring Identify & coordinate changes Rules driven Notifications Actions & Workflow MS Project MS PowerPoint CAD Model CAD Model

  20. Identify & monitor changes Document Management MS Excel MS Word ProjectWise Dependency Service MS Project MS PowerPoint CAD Model CAD Model

  21. Identify & monitor changes Document Management MS Excel MS Word ProjectWise Dependency Service MS Project MS PowerPoint CAD Model CAD Model

  22. Use Cases Don’t approve a change without an Impact Analysis report… • Shorten the approvals cycle, Document and Component dependencies • Compliance assurance Requirements management • Capture, Apply and Assess risk Activity Management • Take control of your IP and reuse it Templates • Monitor engineering process Dash Board • Records and evidence of your business process Audit Trail

  23. Rules driven Notifications • Changes are examined against a list of Rules, and if they pass… • Notify interested parties • Initiate a business workflow • Trigger a batch operation • Any combination of the above Content definition & extraction Dependency viewing & authoring Identify & coordinate changes Rules driven Notifications Actions & Workflow

  24. Windows Workflow Foundation • Sequential Workflow • Typically Flow Chart based, progresses from one stage to next and does not step back) • State Machine Workflow • Progress from 'State' to 'State', these workflows are more complex and return to a previous point if required • Rules-driven Workflow • Implemented based on Sequential workflow. The rules dictate the progress of the workflow Content definition & extraction Dependency viewing & authoring Identify & coordinate changes Rules driven Notifications Actions & Workflow

  25. What is available today? Content definition & extraction Dependency viewing & authoring Identify & coordinate changes Rules driven Notifications Actions & Workflow Get it now!

  26. 2010 Roll-out User Workshops • 5 – 10 users, regional - 1/2 day • On-site - information model creation – 3 day Pilot projects Live Zone

  27. Thank you igal.kaptsan@bentley.com

More Related