An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Buffalo Bayou Development Team Presented and arranged by: Jason Vila and Sergio Castillo

  2. Project Description • Requirements: • Family oriented entertainment • Scenic over look of the bayou • Ample parking space • Scenic park, entertainment, and fitness options • Generate enough revenue to pay back construction costs • Details: • 2.5 acres • Previously served as two parking lots • Bounded by Commerce Street, La Branch Street, and Caroline Street • Flood plain for the Buffalo Bayou

  3. Conceptual Ideas • Building Features and Land Use: • Restaurants • Outdoor Theatre and Stage • Night Club • Retail Space • Gym • Rock gym and central rock climbing pillar • Dodge ball or Sky High • Flood Plain • Rain water harvesting facility on roof

  4. Architectural Design Perspective View X –ray Elevation Plan Elevation

  5. Conceptual Rendering Perspective View Site Plan realistic

  6. Foundation and Structural Plans • Foundation: • Due to the previous status of the site being a parking lot, the foundation has already been constructed with concrete. • The parking lot will remain as the building will expand upward. • Structural : • Entire structural plan will be based on concrete. • Concrete beams: 5 – 10 ft. • Concrete girders: 10 - 25 ft. • Concrete columns: 20 - 25 ft.

  7. Construction Specifics • Glass windows • Tile flooring • Accessible Green roof • Concrete walls (could be tile) • Retaining walls on the roof • Lockers for the gyms • Parking lot at ground level • Hydraulic Pump Elevators • Inside retailing --- involves core and shell construction (walls, flooring, etc.)

  8. Budget and Construction Schedule

  9. Area Water and Wastewater

  10. Satellite Visual