1 / 28

XTOD Vacuum Controls Final Design Review

XTOD Vacuum Controls Final Design Review. Steve Lewis/Keith Kishiyama 13 March 2008. Some Guidelines. Re-use existing LCLS or planned XES technology when feasible Lower cost and schedule risk Reduce maintenance cost and overall complexity Else use SNS technology as ‘best-practices’ example

Télécharger la présentation

XTOD Vacuum Controls Final Design Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. XTOD Vacuum ControlsFinal Design Review Steve Lewis/Keith Kishiyama 13 March 2008

  2. Some Guidelines • Re-use existing LCLS or planned XES technology when feasible • Lower cost and schedule risk • Reduce maintenance cost and overall complexity • Else use SNS technology as ‘best-practices’ example • Recent; working; EPICS-based • FEE has very limited physical space, but ‘acceptable’ radiation levels • Place short racks under beamline (with short cable runs) for instruments • Use full-height racks in alcove for vacuum controllers • XRT will use short racks for vacuum

  3. Introduction • There are three types of systems • ‘Standard’ beamline • Diagnostic ‘tanks’ (for instruments) • High pressure/high flow regions (gas detector/gas attenuator) • PLC vs EPICS • PLC will provide protection (basic interlocking) using direct signals (analog, digital) • EPICS will provide sequencing (via PLC and serial communications to controllers) LCLS Standards will be indicated with: √

  4. Common Items • Allen-Bradley for PLC • CLX-5000/1756 chassis for PLC √ • Ethernet and Ether/IP for IOC communication √ • ControlNet for outboard I/O communication √ • 1 for FEE Gas Flow; 1 each for FEE, NEH, XRT vacuum • For ‘logical’ independence • Flex-I/O for I/O points • Inexpensive • Built-in screw terminals (simple) • Mounted vertically in racks with co-located controllers • 1 for FEE Gas Flow; 3 for FEE; 1 for each NEH Hutch; 5 for XRT; 1 for FEH • VAT VF-2 Fast Shutter between Dump and FEE • Bi-directional protection • Vendor supplied sensors, shutter, cables

  5. Common Items • ‘Cross-over’ Valve Logic • The PLC that controls it needs a pressure indication ‘from the other side’ • Use two signals: 1/0 => HV; 0/1=>atmos; 0/0 and 1/1 => no power, disconnected cable, etc • PLC can resolve permission-to-open logic for any case

  6. Machine Protection System • Each PLC summarizes status of items that can intercept beam; • Isolation valves must be OUT • Apertures must be IN or OUT • MPS gets ‘OK’ if all of above are TRUE (‘and-operation’) • Wired to MPS node in NEH hall with 24V pair • Signals list: PLC:FEE1:E101 VVPG:DMP1:881 FstSht VVPG:FEE1:111 FstSht VVPG:FEE1:421 KS VVPG:FEE1:451 TE VVPG:FEE1:481 DI VVPG:FEE1:761 HOMS VVPG:FEE1:861 HOMS VVPG:FEE1:1721 SOMS VVPG:FEE1:1791 SOMS VVPG:FEE1:2831 SOMS VVPG:FEE1:1831 SOMS VVPG:NEH1:131 NEHVac VVPG:NEH1:2131 NEHVac VVPG:NEH1:1131 NEHVac PLC:FEE1:E202 VVPG:FEE1:201 GasAtt VVPG:FEE1:211 GasDet VVPG:FEE1:221 GasDet VVPG:FEE1:231 GasDet VVPG:FEE1:241 GasDet VVPG:FEE1:251 GasAtt VVPG:FEE1:261 GasAtt VVPG:FEE1:311 GasAtt VVPG:FEE1:341 GasAtt VVPG:FEE1:351 GasAtt VVPG:FEE1:361 GasDet VVPG:FEE1:371 GasDet VVPG:FEE1:381 GasDet VVPG:FEE1:391 GasAtt PLC:NEH1:203 VVPG:NEH1:291 NEHVac VVPG:NEH1:2211 NEHVac PLC:XRT1:104 VVPG:XRT1:111 TnlVac VVPG:XRT1:5251 TnlVac VVPG:XRT1:5611 TnlVac VVPG:XRT1:5991 TnlVac PLC:FEH1:505 VVPG:FEH1:5441 FEHVac

  7. Block Diagrams

  8. Controller Summary • FEE: • 1 Shutter, 9 Ion, 5 Scroll, 9 Turbo, 17 Gauge, 5 Pressure • 13 Isolation/Gate Valves, 26 Rough/Fore/Bypass Valves • NEH • H1: 2 Ion, 2 Gauge; 3 Isolation Valves • H2: 1 Ion, 1 Gauge; 2 Isolation Valves • H3: 1 Ion, 1 Gauge [probably not in scope] • XRT • 4 Ion, 4 Gauge; 3 Isolation Valves • FEH • 1 Ion, 1 Gauge; 1 Isolation Valve

  9. Cable Summary • FEE: • 5 Shutter, 16 Ion, 5 Scroll, 9 Turbo, 39+23 Gauge, 9 Pressure • 39 Valve • NEH • H1: 3 Ion, 6 Gauge; 3 Valve • H2: 2 Ion, 4 Gauge; 2 Valve • H3: 1 Ion, 2 Gauge [probably not in scope] • XRT • 8 Ion, 16 Gauge; 3 Valve • FEH • 1 Ion, 2 Gauge; 1 Valve

  10. ‘Standard’ Beamline • Expect steady-state operation • Mostly HV (~10-6); some UHV (~10-10) • Manual valve and roving cart for roughing/venting √ • Not part of control system • Hardware • Gamma MPC-2-100 dual Ion Pump HV supply √ • One pump per supply • 9 in FEE; 3 in NEH • MKS 937A Gauge Controller √ • Two pairs of Convectron-Enhanced Pirani + Cold Cathode • 10 in FEE; 3 in NEH • Sequences: none

  11. Process Diagram Cold Cathode Gauge Convection-Enhanced Pirani Gauge (Isolation) Gate Valve Manual Cart Valve Ion Pump

  12. Gauge Controller Ion Pump Controller Interconnect Diagram Ethernet (Channel Access VLAN) Ethernet (Field-bus VLAN) ControlNet LadderLogic PLC Flex I/O ControlNet Interface IOC Ethernet Interface Ethernet Interface ControlNet Interface Beamline Gate Valve I/O Gate Valves TerminalServer Analog and Digital Signals RS-232 Pirani + Cold Cathode Gauges RS-232 Ion Pump

  13. Diagnostic Tanks • Three instruments: Direct Imager, Total Energy,K-Spectrometer • Expect many pump/vent cycles • HV (~10-6) • Valved Turbo/scroll pump for roughing • Vent valve with clean N2 for up-to-atmosphere • Hardware (each instrument) • Gamma MPC-2-100 dual Ion Pump HV supply √ • One pump per supply (can be shared by 2 instruments) • MKS 937A Gauge Controller √ • Two pairs of Convection-Enhanced Pirani + Cold Cathode • Varian V-81 Turbo-molecular Pump/Controller • Varian SH-110 Scroll Pump/Remote AC Contactor • Sequences: Pump↔Vent

  14. Process Diagram Cold Cathode Gauge Convection-Enhanced Pirani Gauge (Isolation) Gate Valve Vent Valve Roughing Valve Ion Pump Turbo Pumpw/vent valve Scroll Pumpw/fore valve

  15. Gauge Controller Ion Pump Controller Turbo Pump Controller Magnetic Starter Process Diagram Ethernet (Channel Acces VLAN) Ethernet (Field-bus VLAN) ControlNet LadderLogic PLC ControlNet Interface Flex I/O IOC Ethernet Interface Ethernet Interface ControlNet Interface Beamline Gate Valve I/O Valves TerminalServer Analog and Digital Signals Scroll pump control Scroll Pumps RS-232 Pirani + Cold Cathode Gauges RS-232 Ion Pump RS-232 Turbo Pumps

  16. Gas Pressure/Flow • Three sections: Upstream Gas Detector, Gas Attenuator, Downstream Gas Detector • Each has independent pressure set-point, with differential pumping to enclosing beamline, and shared differential pumping between them • Three modes: • HV open to match beam lines (all apertures retracted) • Vented (all apertures retracted) • Independent pressure set-points (all apertures inserted) • ~few mT to ~20T of N2 • Hardware • 2 each MKS146C, PR-4000, MKS-649, PRD-2000 pressure/flow controllers • 7 MKS 937A Gauge Controller ✓ • Each 4 Convection-Enhanced Pirani +1 Cold Cathode • 2 each Varian 301, 701, 1001 Turbo-molecular Pump/Controller • 6 Varian 600DS Scroll Pump/Remote AC Contactor • 2 Kashiyama MU100 Screw Pump • Sequences: Flow↔HV↔Vent

  17. Process Diagram Baratron Gauge Cold Cathode Gauge Convection-EnhancedPirani Gauge (Isolation)Gate Valve Aperture Aperture Pressure/Flow Valve Roughing Valve Roughing Valve Screw Pump Turbo Pumpw/vent valve Scroll Pumpw/fore valve x3 x2 x6

  18. Gauge Controller Pressure Controller Turbo Pump Controller Magnetic Starter Process Diagram Ethernet (Channel Acces VLAN) Ethernet (Field-bus VLAN) ControlNet LadderLogic PLC ControlNet Interface Flex I/O IOC Ethernet Interface Ethernet Interface ControlNet Interface Beamline Gate Valve I/O Gate Valves TerminalServer Analog and Digital Signals Scroll pump control Scroll + Screw Pumps RS-232 Pirani + Cold Cathode + Baratron Gauges RS-232 Pressure/Flow Units RS-232 Turbo Pumps

  19. Racks & Power • 40U/80″ • 1 Triple Bay for FEE Instruments + Gas Flow • 1 for SOMS • 24U/42″ Under beamline • 1 for HOMS; 6 for XRT • Rack power distribution • Furman unit with 100A input; 1 in each 24U rack; 2 in 40U double rack√

  20. Software • EPICS √ • Base, extensions shared with XTOD Instrument controls√ • Modules: • Ether/IP added for IOC-to-PLC√ • IOC will run in either Linux (soft) or 1-U Dawn/RTEMS√ • Applications • PLC ladder logic does pure interlocking, using analog/digital signals • All commands/response from/to EPICS • EPICS sequencers will provide all vacuum (pump/valve) sequences; and they will control pressure set-points for gas flow

  21. Photos of Ongoing Fabrication at LLNL

  22. Prototype of Flex-I/O Wiring

  23. Partly Loaded Main FEE Rack(front)

  24. Partly Loaded Main FEE Rack (rear)

  25. References • Complete Spreadsheet of all PVs, controllers, racks, VME boards, etc: • http://www.slac.stanford.edu/grp/lcls/controls/systems/xray_transport/Sheets/XTOD-Controls-Planning.pdf • Complete Block Diagram: • http://www.slac.stanford.edu/grp/lcls/controls/systems/xray_transport/Diagrams/XTOD-Vacuum.pdf

  26. Complete book of wiring diagrams available

More Related