1 / 21

(Title) – Final Design Review (FDR)

(Title) – Final Design Review (FDR). Edits are made on the slide master accessed via: /View/Master/Slide. Update logo. Date of Review First Use Acknowledgements Image of diagnostic. Establish Key Contacts. (name) PI (name) PA. LLE Will Complete after the review.

kato
Télécharger la présentation

(Title) – Final Design Review (FDR)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. (Title) – Final Design Review (FDR) Edits are made on the slide master accessed via: /View/Master/Slide Update logo Date of Review First Use Acknowledgements Image of diagnostic Establish Key Contacts (name) PI (name) PA LLE Will Complete after the review Update Date from: /View/Master/Slide Master Enter number of pages – required for PDM submittal 5/17/10

  2. Overview - Motivation -Summarize Scope-Summarize Motivation Campaign Details:EP or Omega Or Joint Shot?;Campaign Type? Side Lighter/ Back Lighter?What TIM’s or Fixed? High Xrays, High Yield? High EMP?, Tritium? 5/17/10

  3. Requirements List RequirementsMechanical - PositioningPerformanceAccuracy Show/Validate that the requirements have been met 5/17/10

  4. Target Diagnostic Check List (Diagnostics Only) – Disclose Equipment Requirements Double Click and Edit; Items marked “Y” should show up on a slide in the presentation 5/17/10

  5. Design Concepts • 1) Present Design – LLE will ask questions on the following topics (be prepared): • Weight • Rigging – CG – Handles that straddle CG • Vacuum/optical Compatible materials • FEA • Safety Note must be in LLE ME hands prior to FDR • 2) “Target Diagnostic Check List” Cover Items checked “Y” • 3) Issues Options Trade offs 5/17/10

  6. Beam Envelope – Clearances – Space Envelope Step File must be sent to LLE 1 week prior to the review for beam clearance and space envelope checks 5/17/10

  7. P &ID – Tutorial Located on LLE Web Site 240 psi 240 psi 240 psi pump 5/17/10

  8. System Level Cabling Diagram – Shows system interconnects 5/17/10

  9. Detail Electronic Design – (show wire numbers/cabinets) Need to show cable and wire numbers – cable connections is a significant cause of shot delays 5/17/10

  10. Space Claim – Floor Plan Temporary Scopes and PS’s 5/17/10

  11. Operations Installation steps Setup/Alignment Overview Typical Shot – Steps to Service diagnostic SRF Definition Status of Procedure –install, Alignment and shot operations draft procedure must be submitted to LLE prior to FDR 5/17/10

  12. CDR Action Items Copy CDR Action Items Table Here; Review after the design presentation; this helps LLE to understand the items are addressed 5/17/10

  13. Viewing/Editing SRA – 1) Click on your project from the project status summary to get to the LLE Project Milestones page 3)Edit then Select Save & Print 4)This button allows the SRA to be viewed/printed/saved – Save the SRA 5)Take a screen shot of the SRA and place in presentation 2) Select SRA 5/17/10

  14. SRA 5/17/10

  15. FMEA – Each Entry on SRA requires an Entry on FMEA; additional entries can be made Enter the Line #’s into the SRA Form (Associated Risk) There must be a change in one of these two columns (Before vs After) Double Click & Edit 5/17/10

  16. Viewing EQC 1) Click on your project from the project status summary to get to the LLE Project Milestones page 3) Select “Save & Print Landscape”; Take a screen shot of each page and put in presentation (two slides) 2) Select EQC 5/17/10

  17. EQC 5/17/10

  18. EQC 5/17/10

  19. Issues - Risks 5/17/10

  20. Resources – Who does What - Assignments Spares - Maintenance 5/17/10

  21. Budget (LLE Reviews Only) 5/17/10

More Related