Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP). ESSIP Plan 2013. Oscar ALFARO DSS/EIPR 13.09.2013. Objective COM09. Explanation What is new or has changed since previous ESSIP edition Link to European ATM Master Plan

lilly
Télécharger la présentation

ESSIP Plan 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Objective COM09 - Migrate ground international or regional X.25 data networks or services to the Internet Protocol (IP) ESSIP Plan 2013 Oscar ALFARO DSS/EIPR 13.09.2013

  2. Objective COM09 • Explanation • What is new or has changed since previous ESSIP edition • Link to European ATM Master Plan • Most important SLoA(s) • Finalisation Criteria and Closed Questions • Supporting Material • ESSIP Report 2012 • Objective Coordinator’s Analysis, recommendations, tips & tricks • Conclusions • Links and contacts ESSIP Plan 2013 / Objective COM09

  3. Explanation • A replacement of X.25 for networks with a common standard at European level is needed due to the diminishing support by the industry for this protocol. • Regulation (EC) No 633/2007 on the application of a common FMTP implies de facto that IPv6 is the new standard for data networks or services. • IPv4 is accepted as a transition to IPv6. • Closely linked to the PENS project. • All ECAC states should migrate their international or regional data services to IPv6 by the full operational capability date. • The objective is an enabler for objective ITY-FMTP. • Deployment date: end 2014 • Applicable to All ECAC States ESSIP Plan 2013 / Objective COM09

  4. What is new or has changed since previous ESSIP edition • Nothing ESSIP Plan 2013 / Objective COM09

  5. Link to European ATM Master Plan • [CTE-C11a]-PENS: Set up of a first interconnection of existing IP national data transport networks deployed by various ANSPs. • [CTE-C11b]- Gateway to interconnect the Stakeholder's Networks (ANSP/PENS, Airport, Airspace Users) [Ground IP Network]: A European IP based data transport network is deployed for ground/ground communications. This network is the main element of the communication infrastructure supporting all the Ground/Ground and Air/Ground communications. This network will interconnect the ATM Stakeholders (ANSP, Airport, Airspace Users, Network Manager) through gateways. ESSIP Plan 2013 / Objective COM09

  6. Most important SLoA(s) • COM09-ASP01Migrate international or regional X.25 data networking facilities and/or services to IP (Covers the transitional migration to IPv4, where applicable) • COM09-ASP03Migrate international or regional X.25 data networking facilities and/or services to IPv6 (Covers the migration to IPv6, either directly from X.25 or from IPv4) ESSIP Plan 2013 / Objective COM09

  7. Finalisation Criteria and Closed Questions • COM09-ASP01Migrate international or regional X.25 data networking facilities and/or services to IP • Finalisation Criteria (wrong in the published version of the ESSIP Plan 2013 – corrected in the ESSIP Database end September) should read: International and regional ATM applications stipulated to make use of IP networks are in operation under IPv4. • COM09-ASP03Migrate international or regional X.25 data networking facilities and/or services to IPv6 • Finalisation Criteria: International and regional ATM applications stipulated to make use of IPv6 networks are in operation under IPv6. • No additional closed questions for these SLoAs ESSIP Plan 2013 / Objective COM09

  8. Supporting Material • Regulation (EC) No 633/2007 of 7 June 2007 laying down requirements for the application of a Flight Message Transfer Protocol (FMTP) • Regulation (EU) No 283/2011 of 22 March 2011 amending Regulation (EC) No 633/2077 • Pan-European Network Services (PENS) ESSIP Plan 2013 / Objective COM09

  9. ESSIP Report 2012 • ANSPs’ plans as reported in 2012 are in line with the stipulated deadline of December 2014. ESSIP Plan 2013 / Objective COM09

  10. Objective Coordinator’s Analysis, recommendations, tips & tricks • Ensure information is consistent with ITY-FMTP • Make sure it is clear whether there is a plan to migrate to IPv4 as a transition to IPv6 and specify plans and dates for both, where applicable • Pan-European Network Services (PENS) implementation can facilitate the implementation ESSIP Plan 2013 / Objective COM09

  11. Conclusions • N/A ESSIP Plan 2013 / Objective COM09

  12. Conclusions • Objective Coordinator: Oscar ALFARO; +32 2 729 4665 Oscar.ALFARO@eurocontrol.int • DNM Objective Expert(s): Liviu POPESCU; +32 2 729 3757 Liviu.POPESCU@eurocontrol.int ESSIP Plan 2013 / Objective COM09