SIXTH FRAMEWORK PROGRAMME [6.1]. [ Sustainable Energy Systems ]. Introduction to the NEEDS project. Andrea Ricci, coordinator ISIS Cairo, 28 January 2008. NEEDS New Energy Externalities Development for Sustainability. Integrated Project within FP6

linoc
Télécharger la présentation

Introduction to the NEEDS project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SIXTH FRAMEWORK PROGRAMME [6.1] [ Sustainable Energy Systems] Introduction to the NEEDS project Andrea Ricci, coordinator ISIS Cairo, 28 January 2008

  2. NEEDSNew Energy ExternalitiesDevelopment for Sustainability • Integrated Project within FP6 • Duration: 48 months (+6), started September 2004 • 66 partners (15% are SMEs), representing Universities, Research Institutions, Industry and NGOs from 27 Countries (19 EU members, 3 MED, 5 ‘Other’) • Leading partners: • ISIS (IT) – Coordinator • DLR (DE) • IER Stuttgart (DE) • OME (FR) • Uni Prague (CZ) • CNR-IMAA (IT) • PSI (CH) • SWECO (NO) • 1118 p.m; 11.7 MEuro (7.6 MEuro financed by EC)

  3. Overall objective To evaluate the full costs and benefits (i.e. direct + external) of energy policies and of future energy systems, both at the level of individual countries and for the enlarged EU as a whole

  4. Objectives and targetedinnovation • Life Cycle Assessment (LCA) of new energy technologies for which the current LCA knowledge is insufficient • Monetary valuation of externalities associated to energy production, transport, conversion and use, with major innovation in : • methods • impacts so far insufficiently addressed • availability and reliability of quantitative evidence • Development of a consistent and robust analytical platform allowing to integrate the full range of information and data on LCA and external costs into a Pan-European modelling framework

  5. Objectives and targeted innovation (2) • Technology roadmap and stakeholders perspective • terms and conditions for an effective formulation and implementation of long term strategies based on the internalisation of external costs • robustness of the research results under various stakeholder perspectives • Transferability and generalisation • calculating, transferring and presenting the uncertainty of default values for average/aggregate external costs • Integration • structured “protocol” to facilitate the widespread use of the integrated analysis framework

  6. The NEEDS products • Reports, including • (i) documents that illustrate methodological issues, the science behind them and the process that has led to their development • (ii) documents that present the results obtained (both qualitative and quantitative) • Databases • Tools, i.e. software that is fully or partially available to third parties. • LCA database • Technology repository • Stakeholders database • Database of electricity generation technology specific sustainability indicators • … • Ecosense Web • Integrated modelling platform • Country models • Pan European model • Web based platform for elicitation of stakeholders preferences • …

  7. Providing inputs to energy policies • Who are the target users of the NEEDS results? • Which policy queries can be answered by NEEDS? • In which format and with what functionalities will the NEEDS results be provided to the users? • How will it practically be possible to access and exploit the NEEDS products? • What will happen once the NEEDS project is finalised?

  8. Target users

  9. Addressing policy queries • … by using evidence directly produced by the project

  10. Etc.

  11. Policy queries • Using evidence directly produced by the project • (simple) elaboration of the direct evidence

  12. Etc.

  13. Policy queries • Using evidence directly produced by the project • (simple) elaboration of the direct evidence • using the NEEDS modelling results • running the NEEDS modelswith new sets of assumptions • Introducing changes in the modelling tools • Carrying out additional, novel research

  14. Etc.

  15. Policy queries • Using evidence directly produced by the project • (simple) elaboration of the direct evidence • using the NEEDS modelling results • running the NEEDS modelswith new sets of assumptions • Introducing changes in the modelling tools • Carrying out additional, novel research

  16. Etc.

  17. Policy queries • Using evidence directly produced by the project • (simple) elaboration of the direct evidence • using the NEEDS modelling results • running the NEEDS modelswith new sets of assumptions • Introducing changes in the modelling tools • Carrying out additional, novel research

  18. Etc.

  19. Policy queries • Using evidence directly produced by the project • (simple) elaboration of the direct evidence • using the NEEDS modelling results • running the NEEDS modelswith new sets of assumptions • Introducing changes in the modelling tools • Carrying out additional, novel research

  20. Etc.

  21. NEEDS beyond NEEDS • Continuing access to the NEEDS results and tools • Continuing dissemination including website • Updating of the NEEDS databases • Improvement (coverage, new data) of the NEEDS databases • New policy-driven elaborations of NEEDS results • New model runs • Improvement of the modelling platform • New research

More Related