50 likes | 175 Vues
This summary outlines the findings from the April 2014 Residents' Questionnaire, where 247 were delivered, 242 collected, and minimal declines occurred. It details the participation in the electoral role as of November 2013, shows funding received for the project, and highlights subsequent actions based on survey feedback, including a call for sites and initiatives related to village design and conservation areas. Notable grants include an initial £2,630 in March 2013 and a subsequent £4,370 in April 2014, underscoring community engagement.
E N D
Residents Questionnaire – evidence base Delivered 247 Collected 242 Blank 4 Declined to take part 4 properties 9 residents Declined – Rental/moving 6 properties 12 residents Electoral role Nov 2013 289 Participation 285
Data Orchard -Initial report 23 April -Parish feedback Open meeting – May Funding Initial Grant £2630 received March 2013 Second Grant £4370 received – April 2014
Other Activities (taken from Survey results report) • SHLAA – call for sites
4 students + Adam Sheppard (UWE) 25 April • Village Design Statement • Conservation area • Referendum – Dec-Jan