An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Replication Change Caseformerly The Northeast Market Change Case Presented by a Coalition of Independent Generators

  2. Consultant's Scope • Examine the methods used by NEISO in “fork lifting” the PJM market systems for New England’s use • Understand the term “fork lifting” ~ How was it managed? • What process was used and which aspects of the PJM market represent exception items that did not fit New England? • How much of the ongoing market redesign (CMS-EMMS) was effectively leveraged in using PJM’s market design? • How much time and money did the NE-ISO system truly save ? • What design characteristics already chosen by TNT can be fully leveraged in adopting an existing Eastern Market design? • What aspects of the NE-ISO design cannot be adopted for the ERCOT nodal design? RCCWG

  3. Market differences that cannot be incorporated-Preliminary Assumptions • ICAP – Turn all related features OFF • IDAM – Implement ADAM with the capability to transition to EHDAEM • OASIS – Turn all related features OFF • Congestion Rights Engine – Grand Fathered Rights concept adjusted to ERCOT’s PCRR concept • Additional changes to software may only be driven by actual system physical requirements • Settlement Issues - ? • Marginal Losses Calculations – Turn feature OFF in the LMP algorithm and add it as a post processing variable • Other items to be developed with assistance of Consultant and agreement of CBCG-LT RCCWG

  4. Benefits Reduced: • Risks in market design • Risks in market system implementation • Cost of market development and maintenance • Time required for market implementation • ERCOT manual workarounds Comparing an LMP market to the current ERCOT design RCCWG

  5. Benefits • Stakeholders will have more time to prepare and train for a smooth transition to the new market • Less training for some TNT market participants • Better support from vendors • ERCOT can focus on system enhancements RCCWG

  6. Summary • One region of the country, NE-ISO, managed the risk of transitioning to a nodal market by adopting a market design and market system infrastructure from another region, PJM. • Other regions that have considered market redesign have borrowed heavily from this approach • This approach would certainly have value for ERCOT RCCWG

  7. Motion • To accept the Replication Change Case as one of the four scenarios the Consultant must study, using the NE-ISO market systems as the basis. RCCWG