1 / 5

RR-TAG Opening Report

RR-TAG Opening Report. Authors:. Date: March 2014.

liora
Télécharger la présentation

RR-TAG Opening Report

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RR-TAG Opening Report Authors: Date: March 2014 Notice:This document has been prepared to assist IEEE 802.18. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Michael Lynch, MJ Lynch & Associates LLC

  2. Overview • This document reports on the regulatory matters considered and outputs after the end of the January, 2014 Wireless Interim. • One document that is of a high level of interest to IEEE 802 was approved by the RR and 802.24 TAGs in a further response to ITU-R Question 236/1, dealing with technologies and spectrum used in the management of Smart Grids. This document, 18-13-0117-06, is on the EC consent agenda. Michael Lynch, MJ Lynch & Associates LLC

  3. Overview • This document reports on the regulatory matters considered and outputs after the end of the January, 2014 Wireless Interim. • One document that is of a high level of interest to IEEE 802 was approved by the RR and 802.24 TAGs in a further response to ITU-R Question 236/1, dealing with technologies and spectrum used in the management of Smart Grids. This document, 18-13-0117-06, is on the EC consent agenda. • The RR-TAG is input driven. The attendance varies depending on the topics & documents being considered. For example at one recent meeting there were 25 people from different WGs helping draft an output. At another there were over 150 present primarily to hear an update on a recent ITU-R meeting. But there can be as few as a handful. • Final approval of documents is intended to be done Thursdays during AM1 and AM2. Michael Lynch, MJ Lynch & Associates LLC

  4. Items to be considered at this meeting • The RR-TAG will review two liaison documents from ITU-T Study Group 15 that are asking ITU-R to “allocate” spectrum or depict the use of wireless technologies. • 18-14-0012 is titled “LIAISON TO ITU-R STUDY GROUP 1 REGARDING G.wnb, NARROWBAND WIRELESS HOME NETWORKING” and is asking ITU-R WP1A and SG1 to “allocate” specific spectrum for in home networks. • 18-14-0013 is titled “Liaison statement to ITU-R SG 1 regarding draft Amendment 1 to Recommendation ITU-T G.9955 (2011) (ex G.hnem)” and can be seen to provide the PLC to home meter topology which is shown with a wireless element. • 802.18 is contribution driven and it is fair to expect that other matters will present themselves during themeeting here in Beijing. Michael Lynch, MJ Lynch & Associates LLC

  5. Additional RR-TAG Items for March: • Further contributions to ITU-R, FCC, and to other regulatory bodies are added as needed. Many of these items appear with short notice to the TAG and with very short response times. • The RR-TAG agenda can be found on the RR-TAG’s Mentor web site; expect that as normal there will be many revisions prior to the start of the meeting. • Don’t forget that for the most part you can maintain your voting rights in your home group when you participate in the RR-TAG (and, of course, log your attendance correctly!). Michael Lynch, MJ Lynch & Associates LLC

More Related