An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. (PROTECT) Exercise -Exercise - Exercise: Exercise Tempest Dawn 2013 • Strategic Information Briefing • Date / Time / Authorized By:

  2. Major Incident following storm force winds and tornados In Portsmouth and surrounding areas

  3. Portsmouth and South Hampshire Harbour disruption, trees down at SJH

  4. Local Impact / Many roads and all rail blocked

  5. Media Interest • Widespread media / Lead story

  6. Summary Outline of Strategic Effects National effects: • National media exposure / Health and safety risks and incidents requiring corporate decision making: Regional effects: • Regional Comms, disruption to normal buisness. Local Areas effects (mainly Portsmouth and Southampton) • (X) community hospitals damaged and on back up power • NHS E request for interim ward capacity 40 beds. • 6 Health Centers damaged, (one closed)

  7. Incident Control Room: Based in Portsmouth St James Hospital. (On back-up power) Incident Controller: Jamie Andrews 6 staff in Support.

  8. Key Resource Requests: agreed or awaiting decision • Operational Resources • Equipment • Personnel • Assets • Premises • Information

  9. Issues identified to this point • Widespread power outage • SJH – • Significant damage to fabric of Main Building • Roof damage • Wall collapse following hit by trees • Main, Solent & Orchards Drives blocked • Sewers overflowing • No power since storm hit • Cosham Health Centre • Tree collapse on North end of building major structural damage • Lake Road Health Centre • Minor damage to roof • Broken windows • Intermittent power supply • SMCHC • Multiple buildings with minor damage to roof /windows and some water ingress

  10. Exercise ExerciseExercise Wessex X 6 Buildings compromised Building 1 - Cosham Health centre Asbestos risk (Conor Mulholland informed)qualified staff on site working with fire & police Building evacuated Relocating Primary Care Services to Acorn Lodge Building 2 – St James’ Hospital several areas with structural damage but no in-patients - running generator power – engineer on site to maintain generators all structural damage and risk cordoned off – preparing two wards to accept x 35 patients from Swell Being- ETA 13.30

  11. Strategic Decisions and Company Approach for response • Building x 3 • St Mary’s CHC • Generator 24 hr fuel supply – sourcing fuel from unaffected sites • Incidences of localised flooding – not material risk • Window damage staff on site making safe • Building x 4 • Swellbeing Private Hospital • Major damage to infrastructure • X 35 patients relocated to SJH ETA 13.30

  12. Exercise ExerciseExercise Wessex • Building x 5 + 6 • Lymington & RSH • Managed by local contractors Rydon– minor damage • Lymington on generator power

  13. Comms phone calls outgoing • Update to NHS England • Lymington Hospital H & S Officer • Working with Rydon Maintenance team • RSH No staff made it in • Contact Southern Electric • Asbestos Risk • Qualified staff on site working with fire brigade • HSE • Local police

  14. Comms phone calls incoming • Portsmouth News • BBC South • Ted Nugent – Lymington Hospital • RSH - Barry Toward – asked to contact SHFT as no power • Ian Daccus - Area Manager Kent Offer of engineers accepted • Tom Brown – Leicestershire offering staff & vans

  15. Communications • NHS England & CCG briefed on position and mediation plans • 35 relocated patients to SJH • Cosham HC to Acorn Lodge • Asbestos risk contained at Cosham HC • No fatalities or major injuries reported to date

  16. Identified Strategic Dilemmas (if any) • Planning supplies for additional patients • Communication plan for all NHS PS staff • Review staffing rotas for coming week • Emergency staff accommodation • Funding arrangements

  17. Company Approach for Recovery and Restoration • Hampshire Fire & Rescue Service confirm hazardous materials team working with NHS PS on site • Information from properties with building damage,cleaning,flooding,trees to be RAG rated for prioritising • All staff inc management dressed to clean • Clear directions – who will coordinate? • Clean up –Interserve • Additional cleaning equipment/PPE

  18. Company Approach for Recovery and Restoration • Trees – • Specialist area • Drain/clean up/mop up process • Trees- Burley/Southern trees/TPOs • Building damage • Structural engineer • Estates • Asbestos AP

  19. Exercise ExerciseExercise Wessex • E-mail Conor Mulholland • Insurance update • RIDDOR report – awaiting output from asbestos report • RAG on building condition

  20. End Slide • Date and Time Updated:10.45am • Next schedule update and deadline for additions: • (Info to lead Editor by 00:00 + Date: ) • Lead Editor of Strategic Incident Update: • Contacts of Lead Editor: • Number - ? • Mobile-07515189928 • Email -jamie.andrews@property.nhs.uk