1 / 14

Final Year Projects Orientation

Final Year Projects Orientation. BICSE 4. CONTENTS:. INTRODUCTION. Introduction. =46. Activity. Tentative Date. Project Orientation : October 12th, 2009 Project Proposal Abstract Submission : November 13th, 2008

livana
Télécharger la présentation

Final Year Projects Orientation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Final Year Projects Orientation BICSE4

  2. CONTENTS:

  3. INTRODUCTION

  4. Introduction =46

  5. Activity Tentative Date Project Orientation : October 12th, 2009 Project Proposal Abstract Submission : November 13th, 2008 Proposal Defense :January 04th-08th, 2010 Mid Defense :March 1st-5th, 2010 Final Defense :June- July 28-02, 2010 Open House :July 13th 2010 Breakdown

  6. FYP Theme

  7. FYP PROCESS

  8. Requirements Specs • Design Specs • System Architecture • Technology Selection • Documentation • Project Proposal • Project Concept Verification • Documentation • S/W / H/W • Documentation • Test Cases • System Demo MID Defense Proposal Defense Final Defense Time FYP Process (Our Methodology) Project Inception Project Elaboration Project Construction Concept/ Ideas Literature Survey Feasibility Study Req. Specification System Design & Architecture Implementation Plan Development Report Writing Testing & QA Demonstration O U T C O M E S DEL I VERABLES

  9. FYP POLICIES

  10. 05% 10% FYP GRADING POLICY MID Defense 25% Final Defense Proposal Defense 60% FYP 10% Open House Project Report

  11. FYP POLICIES

  12. PROJECT IDEAS

  13. QUESTIONS

More Related