An overview of proposed changes to Codes OTEG, discussing assumptions, process timelines, governance, transmission services, planning coordination, charging, communications, and data. The document also addresses grid code revisions, connection conditions, system code utilization, and timescales for implementation.
E N D
Initial view on changes to Codes OTEG, 3rd July 2006
Agenda • Assumptions • SO – TO Code • Grid Code • Connection and Use of System Code • Process/timescales for change • Only an initial view at this stage • GB SQSS debate heavily influences changes required • Are current arrangements appropriate offshore?
Assumptions • ‘Offshore Users’ have equitable treatment as ‘Onshore Users’ • Each offshore network has single point of connection to onshore network • Offshore TOs may be nested • Offshore networks may connect to onshore transmission or DNOs • Offshore transmission will only be AC • Must accommodate one or many new TOs • Transitional arrangements may be required prior to enduring regime being implemented • Any regime developed must be adaptable for the future
SO-TO Code (1) • Section B - Governance • Practicalities of extending beyond 3 TOs • Section C - Transmission Services • Switching Arrangements - TO acts under instruction from GBSO • DNO interaction e.g. outage co-ordination • Interaction between offshore TOs • Section D - Planning Co-ordination • Is onshore model applicable offshore?
SO-TO Code (2) • Section E – Charging • Charging Statement for each TO • Section F – Communications and Data • Are confidentiality provisions in STC suitable? • STC Procedures • Full review of existing STCPs required • Requirement for new ‘Offshore STCPs?’
Grid Code • May require further, additional, regional differences • Planning processes • Dealing with potential DNO interfaces • Connection Conditions • Driven by GB SQSS debate • Review connection conditions for offshore • Operating Codes • Safety rules differ for different TO areas • General Conditions • Constitution of Grid Code Review Panel
Connection and Use of System Code • Access • Allocation of access • Compensation for loss of access • Exporting GSPs • Current issue could be exacerbated via DNO connection • Transmission Charging • CUSC/Charging statements work hand in hand • Same as GB regime? • Bilateral Agreements • Are existing onshore pro-formas appropriate?
Process for change - options • Use normal governance arrangements for codes – Authority decision • Ofgem/DTI consult – changes designated by Secretary of State • Issues to consider: • Timescales • Complexity and scope of change • Interactions between codes (cross-governance) • Flexibility • Ensuring all interested parties are included • Utilisation of existing industry expertise • Co-ordination with ongoing GB Code change processes • OTEG liaison with industry panels
Timescales • June 06 Initial view on code changes • Sept 06 Follow on from GBSQSS group • Scope required changes further • Q1 07 Specific identification of required changes • Q2 07 Industry consultation • Q2/3 07 Refinement of changes • Finalise details of legal drafting • Q3/4 07 Final consultation • Mid 08 Go-Live for offshore regime