Network Inventory Conceptual Framework

Network Inventory Conceptual Framework. Tony Breach, Optical Network Manager 9. september 2014. Network Inventory - Index. Project Manager. Objective. Requirements. Supplier Inv. and Analysis. Decision making basis. Project Timeline. Project Manager. Project Manager: Heino Radmer

loman
Télécharger la présentation

Network Inventory Conceptual Framework

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Network Inventory Conceptual Framework Tony Breach, Optical Network Manager 9. september 2014

  2. Network Inventory - Index Project Manager Objective Requirements Supplier Inv. and Analysis Decision making basis Project Timeline

  3. Project Manager • Project Manager: Heino Radmer • Project Team • Heino Radmer • Sören Westerberg • NU-NOC Member • Members that contribute to this project • Lars Bjørn • Mick Krag

  4. BOL Objective • Base Objective • Topology – Physical/Logical • Hardware – Active/Passive • Connectivity – Fibers/Cables/Wireless • Sites • Software/Firmware Versions

  5. End Objective • Device and physical network topology – including automatically device topology discovery • Software and firmware package management • Real time End to End Logical topology including logical end user connection representation • Device diagnostic log for tracking of degeneration in hardware components • Network Resource Management • Device, card, port utilization for maintenance and network planning • End to end logical utilization • Dynamical interaction with the Service Assurance and Provisioning engine • Simulation and planning tools

  6. Requirements • BOL System • Data container will be Excel to MYSQL • How to access and Query – via Excel • End System • Data container MYSQL • How to access and Query – Web based GUI • GUI, Query, Presentation • TB – Web based GUI, Table and graphic presentation of Circuits etc. Possible for open queries • Data Structure • Based on Heino’s Network Inventory Structure • Synchronisation of Data with Live Network • Automatic, Semi Automatic, Manual

  7. Supplier Investigation and Analysis • Alcatel-Lucent • Workshop • Investigate the supplier market for NI’s • Look for co-operational NI’s to Service Assurance Systems

  8. Decision Making Basis • Project Objective, • Project description • Benefits for NN • Price • Resources internal/external • Implementation • Timeline • Operation Responsibility

  9. Timeline • Project start 01-03-2007 • Vendor Workshop and presentations week 11 • Decision Making Basis week 12 • Installation Start Base System 01-05-2007 • Project end Base System 01-07-2007 • KPI’s • NN Transmission 100% ready date 01-07-2007 • NN IP 75% ready date 01-07-2007 • SUNET Transmission 80% ready date 01-07-2007 • SUNET IP 50% ready date 01-07-2007