ClydeNET Glasgow. EastMAN Edinburgh. UKLight Phases 1 & 2, 3. NIMAN Belfast. Glasgow C-PoP. Edinburgh C-PoP. C&NLMAN Lancaster. Leeds C-PoP. Warrington C-PoP. YHMAN Leeds. NNW Manchester. MidMAN Birmingham. Reading C-PoP. EastNet Cambridge. CLRC-RAL. St Pancras. 10G. To CERN.

lonna
Télécharger la présentation

NNW Manchester

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ClydeNETGlasgow EastMANEdinburgh UKLight Phases 1 & 2, 3 NIMANBelfast GlasgowC-PoP Edinburgh C-PoP C&NLMANLancaster Leeds C-PoP WarringtonC-PoP YHMANLeeds NNWManchester MidMANBirmingham ReadingC-PoP EastNet Cambridge CLRC-RAL St Pancras 10G To CERN To FNAL 10G 10G 10G ULCC Amsterdam Chicago 10G

  2. Based upon 10 Gbit/s core • Presents Ethernet at exit points: • Many 100 Mbit/s for long periods times • Few 1 Gbit/s for long periods • in practice pseudo-persistent for now • Cross bridges when (if) we come to them • If needed, and for shorter periods, access to full 10 Gbit/s possible

  3. HEP Connectivity Requests

  4. Service Challenge Connection Requests

  5. ESLEA Collaboration Connection Requests

  6. Other Connection Requests

  7. HEP Provision Tier1 Tier0 • Today: • 2 x 1 Gbit/s in place for RAL  CERN Switched through Amsterdam • 500(290) Mbit/s RAL  Lancaster • 1-Jan 2006 • 6 x 1 Gbit/s • Feb 2007 • Requested 10 Gbit/s

  8. HEP Provision Fermilab  UCL • 1 Gbit/s for foreseeable future

  9. HEP Provision Tier1  Tier2 and Tier2 to elsewhere • Today we have said to UKERNA: • ~ 1 Gbit/s between WITHIN a Tier-2 (i.e. between Tier-2 Institutes) • ~ 1 Gbit/s aggregate from EACH Tier2 to Tier1 (note: this means 4 Gbit/s into RAL !!!) • Next (up to 2007): • Consolidate existing differentiated Tier2 estimations by • Roget Jones & Barney Garret to revisit existing papers • Visit Tier2 sites • Visit experiment reps • Default is that Tier2 uses production network for now until ~2007 • If clear case for dedicated connections for a Tier2 before end 2006 then we WILL ask for it. • BUT to do this is will be essential that someone at Tier2 GUARANTEES to use the connection • we cannot ask and not use. • We cannot do this just based upon generalities • Post 2007 – see next slide

  10. SuperJANET5 and Geant-2 • Geant-2 • Already committed to provided dedicated capacity across GN2 • NRENS will be offered a 10+10 Service (10 IP + 10 GE) • They plan to do this for Tier1 to CERN • SuperJANET5: • Will be fully live by end 2006 • Will incorporate pervasive dedicated circuits • Who pays ? work ongoing ? • Messages for UK sites: • Dedicated circuits can be provided • If your site thinks it needs one we should ask for it – but only if you know you will use it • We must present authoritative documents to UKERNA in advance of SJ5 as and when we know what we need.