1 / 3

LaaR Response During 2006 System Deployments

LaaR Response During 2006 System Deployments. Steve Krein ERCOT. LaaR RRS Performance. April 17, 2006 Manual Deployment of all LaaRs Initiated at Step 2 of EECP 10 minutes after VDI, System Response was 548 MW 6 QSEs Did Not Meet 10 minute Deployment Requirement

lotte
Télécharger la présentation

LaaR Response During 2006 System Deployments

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LaaR Response During 2006 System Deployments Steve Krein ERCOT PUC Meeting

  2. LaaR RRS Performance • April 17, 2006 • Manual Deployment of all LaaRs Initiated at Step 2 of EECP • 10 minutes after VDI, System Response was 548 MW • 6 QSEs Did Not Meet 10 minute Deployment Requirement • System Response at 95% of Obligation in 18 minutes • Protocol Violations Issued to 6 QSEs • October 3, 2006 • UF Deployment for 1 LaaR, Manual Deployment for Remainder • 10 minutes after VDI, System Response was 642 MW • 6 QSEs Did Not Meet 10 Minute Deployment Requirement • System Response @ 95% of Obligation in 19 minutes • Protocol Violations Issued to 6 QSEs PUC Meeting

  3. LaaR Qualification and Performance Enhancements • Initial Qualification • Actual interruption during first 90 days • No pre-notification • Annual Recertification • Actual interruption once a year • LaaR response to Operator VDI that complies with Protocols can be used in lieu of testing • Periodic Command and Control Tests • Hot line call to QSE’s with response verification back from party that actually trips the load • Disqualification Criteria • Failure to meet 10 minute response—Two occurrences in any 365 day period would result in suspension PUC Meeting

More Related