An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Entergy Reliability Assessment and Construction Plan EvaluationLouisiana North ~ Arkansas ~ Mississippi 2007 Transmission SummitJuly 31, 2007New Orleans, Louisiana

  2. Draft Construction Plan ProjectsEntergy Louisiana – North • Bastrop Line Re-configuration (2008) • Red Gum Voltage Improvement (2009) • Sarepta EHV (2011) • Grambling – Winnfield 230 kV (2011)

  3. Draft Construction Plan ProjectsEntergy Arkansas • DeWitt Capacitor (2008) • Cabot EHV (2010) • Grandview (2010) • Gobel (Marvell South) 230/115 kV (2011) • Corning – Texas Eastern #8 Upgrade (2011)

  4. Draft Construction Plan ProjectsEntergy Mississippi • Natchez Capacitor & SVC (2008) • Liberty – Gillsburg (2008) • Liberty – Gloster (2009) • Horn Lake – Allen Upgrade (2009) • Lakeover – Sunnybrook – Ridgeland (2010) • Ray Braswell – Byram (2010) • Rolling Fork Capacitor (2010) • Tillatoba – S. Grenada 230 kV (2011)

  5. SVC NE Louisiana / Natchez Area2012 Summer Peak Red Gum Voltage Improvement2009 Natchez Capacitor & SVC2008 Re-energize Line at 115 kV

  6. NE Louisiana / SE Arkansas2012 Summer Peak Bastrop Line Re-configuration2008

  7. Bastrop Line Re-configurationDetail LOG CABIN GALLION NORTH BASTROP BASTROP IPCO STERLINGTON

  8. North Central Louisiana2012 Summer Peak Grambling-Winnfield 2011

  9. Grambling – WinnfieldDetail Grambling Sailes Lucky Chatham Hodge New Sub 34.5 kV Line Jonesboro 115 kV Line 230 kV Line Substation with breakers Danville Substation with no breakers Dodson Winnfield Winn Prison Standard

  10. NW Louisiana / SW Arkansas2012 Summer Peak Sarepta EHV2010 Reconductor Minden – Minden Bulk

  11. El Dorado2012 Summer Peak

  12. South Central Arkansas2012 Summer Peak

  13. Southwest Arkansas2012 Summer Peak

  14. Hot Springs-Murfreesboro Ark.2012 Summer Peak

  15. Central Arkansas2012 Summer Peak Cabot EHV2010

  16. Little Rock2012 Summer Peak Cabot EHV2010

  17. East Central Arkansas2012 Summer Peak Gobel (Marvell South) 230/115 kV2011 DeWitt2008

  18. West-Central Arkansas2012 Summer Peak

  19. Northwest Arkansas2012 Summer Peak Grandview 2010 Hilltop 2007

  20. North Central Arkansas2012 Summer Peak

  21. Northeast Arkansas2012 Summer Peak Reconductor Line2011

  22. Northwest Mississippi2012 Summer Peak Horn Lake 230/161 kV Auto2009 Horn Lake – Allen 161 kV Line Reconductor2009

  23. Western Mississippi2012 Summer Peak Tillatoba – S. Grenada2011

  24. Greenville – Vicksburg Area2012 Summer Peak Rolling Fork Capacitor 2010

  25. Jackson, Mississippi2012 Summer Peak Sunnybrook Madison Lakeover-Sunnybrook-Ridgeland2008 Lakeover-Livingston Reconductor

  26. South Central Mississippi2012 Summer Peak R. Braswell – Byram2010

  27. Vicksburg Area2012 Summer Peak

  28. SVC Natchez Area2012 Summer Peak Natchez Capacitor & SVC2008 Liberty – Gloster2009 Liberty – Gillsburg2008

  29. Southwest Mississippi2012 Summer Peak McComb Capacitor2007