1 / 16

Monitoring Presque isle bay

Monitoring Presque isle bay. Design and construction of a sediment collection device. Erika Schmidt Sheldon Addis Stephen Cox Benjamin Thompson Nichole McGuire Sean Herron Barry Brinkman, Ph.D. Karinna M. Vernaza, Ph.D. Gannon University, Erie, PA

lovey
Télécharger la présentation

Monitoring Presque isle bay

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Monitoring Presque isle bay Design and construction of a sediment collection device Erika Schmidt Sheldon Addis Stephen Cox Benjamin Thompson Nichole McGuire Sean Herron Barry Brinkman, Ph.D. Karinna M. Vernaza, Ph.D. Gannon University, Erie, PA Regional Science Consortium 8th Annual Research Symposium

  2. History of the Scholarship • Scholars of Excellence in Engineering and Computer Science (SEECS) • NSF, Directorate of Undergraduate Education • Scholarships in Science, Technology, Engineering and Mathematics (S-STEM) • Grant of $600,000 awarded in July 2008 • 11 graduates of the program, to date • 26 current SEECS scholars: five seniors, six juniors, seven sophomores, and eight freshmen • Renewal awarded in May 2012 for $600,000 8th Annual Research Symposium

  3. Background • Creeks are becoming polluted • Debris, Toxic contaminants, etc. • Pennsylvania Sea Grant (Non-profit Organization) • - “Promotes the ecological and economic sustainability of • Pennsylvania's coastal resources through research and outreach … focusing on the Lake Erie and Delaware River drainages of Pennsylvania” • - Partnered with Gannon University SEECS program • - Tasked with building a sediment collection device 8th Annual Research Symposium

  4. DESIGN Constraints • The device to be prototyped and constructed should meet the following constraints: • Collect two (2) liters of wet sediment • Environmentally friendly • Movable by one person • Under SEECS budget • Anchored in place • Durable and reusable • Collect sediment of different sizes 8th Annual Research Symposium

  5. OUTLINE: DESIGN AND BUILDING PROCESS (‘10-’12) • Toured Cascade Creek • Researched methods of sediment collection • Designed, built and tested two prototypes • Combined and optimized initial designs • Constructed final product • Implemented sediment collection device 8th Annual Research Symposium

  6. Research • Initial ideas • Pump water out of creek to a filter • Modified downstream defender • Use bedload sampler 8th Annual Research Symposium

  7. Sediment Collection Device: • Two designs were prototyped and tested Design 1 Design 2

  8. RESULTS OF Weir Tank TESTING Design 1 Design 2 Confetti was employed to simulate sediment. Results were positive. 8th Annual Research Symposium

  9. Sediment Collection Device: • Designs were consolidated and collector built Frame Back Box Front Box

  10. Frame Dimensions • 4 feet long by 2.5 feet wide • 13 inches tall • 8 inch platforms on sides • Lid with latches • Concrete blocks set on sides • Held in place by L brackets 8th Annual Research Symposium

  11. Box Dimensions • Two boxes • 18” long • 12” tall and wide • 8” wide by 5” deep opening • Screen at front and back openings • First Box • Four baffles • Second Box • Three baffles • Elbow joint at exit 8th Annual Research Symposium

  12. Building 8th Annual Research Symposium

  13. Finish Project Cont. Assembled 8th Annual Research Symposium

  14. Implementation Pictures

  15. INITIAL RESULTS • After two weeks in the Cascade Creek, sediment was collected. • Boxes were not locked during the first deployment. 8th Annual Research Symposium

  16. Questions? 8th Annual Research Symposium

More Related