1 / 9

Benefit Cost Analysis

Benefit Cost Analysis. Typically used for public projects The goal is to determine if benefits exceed costs: Benefit / Cost Ratio > 1 The goal is NOT to maximize B/C Ratio. Interest rates used are typically lower than those used by businesses. Typically 4% - 8% (6.5% is typical)

ltemples
Télécharger la présentation

Benefit Cost Analysis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Benefit Cost Analysis • Typically used for public projects • The goal is to determine if benefits exceed costs: • Benefit / Cost Ratio > 1 • The goal is NOT to maximize B/C Ratio. • Interest rates used are typically lower than those used by businesses. • Typically 4% - 8% (6.5% is typical) • OMB requires 10% (except water proj.)

  2. Benefit Cost Analysis The challenge is to quantify the benefits and costs. The equation… B/C = (Benefits – Disbenefits) to the public (Costs) to sponsoring agency You can use NPW, EAW, even NFW – whichever is easier in a particular problem – Hint: Choose EAW or Capitalized Cost to avoid equal lifetime issues!

  3. Benefit Cost Analysis • Steps: • Define the planning horizon. • Specify the Discount Rate (MARR) to be used. • Develop the cost and benefit-disbenefit profiles in monetary terms. • Compare the benefits to costs using a specified measure of worth, such as annual equivalent or present worth. • If the B/C ratio is: • > 1 project is justified • = 1 barely justified – political • < 1 not justified • 6. Repeat steps 3 – 5 for alternative viewpoints

  4. Cost-Benefit Profiles • Primary Benefits – (Users) measurable: • Prevention of costs / savings from implementation • Time savings from implementation • Secondary Benefits – (Users) difficult to measure: • Environment conservation / improvement • Pain & suffering avoidance • Disbenefits – (Users) quantified: • Time lost due to requirements • User fees for Operation & Maintenance • Costs – (Sponsor): • First costs & Salvage • Sponsor Operation & Maintenance (– Revenue) • Operation fees paid by users (+ Revenue)

  5. Quantification Examples • Benefits due to reduction in deaths: • Number of deaths avoided • Average income stream of victims • Benefits due to reduction in property damage: • Number of incidents • Average property damage per incident • Disbenefits due to user fees: • Average number of users • Average fee charged • Disbenefits due to delay time: • Number affected • Average delay duration • Average wage rate of patrons • Costs(+ Revenues due to user fees): • Average number of users • Average fee charged

  6. Vehicle Inspection Program Ex. • State inspects motor vehicles as part of licensing system. Vehicles not passing inspection must be repaired prior to license renewal. • Primary Benefits (Users): • Reduction in deaths due to accidents • Reduction in property damage due to accidents • Secondary Benefits (Users): • Pollution avoidance costs • Savings to accident victims families • Avoidance of pain & suffering • Disbenefits (Users): • Cost of inspection fees • Opportunity cost of time to bring car to inspection • Opportunity cost of time waiting for inspection • Vehicle usage costs for inspection process

  7. Vehicle Inspection Program Ex. • Sponsor Costs (State): • Capital recovery costs of inspection facilities • Operating costs of inspectors & admin. staff • Sponsor Revenues (State): • Inspection revenues (user fees) • Quantifying Benefits: • Deaths avoided • 304 victims of fatal accidents avoided • Income stream lost: $571 106 per victim • Property damage avoided • 37 910 total accidents avoided annually • 63% of accidents are property only • Average property damage: $1 845 per accident • Total Benefits to Users: $217 680 913 / year

  8. Vehicle Inspection Program Ex. • Quantifying Disbenefits: • Cost of inspection fees • 5 136 224 vehicles inspected annually • $5 fee per inspection • Opportunity cost of time to bring vehicle to inspection • 5 136 224 vehicles inspected annually • 1.02 hours of inspection travel per car (round trip) • Average wage rate: $14.02 per hour • Opportunity cost of time waiting for inspection • Average waiting time: 9 minutes (0.15 hr) • 5 136 224 vehicles inspected annually • Average wage rate: $14.02 per hour • Vehicle usage costs for inspection process • 5 136 224 vehicles inspected annually • Operating cost per mile: $0.35 • Average round trip to station: 20 miles • Total Disbenefits to Users: $145 886 225 / year

  9. Vehicle Inspection Program Ex. • Quantifying Sponsor Costs: • Capital recovery of facilities costs • Similar facilities annual cost: $46 376 703 per yr • Operating costs for inspectors & admin • Annual operating costs: $10 665 600 per year • Revenue from inspection fees • 5 136 224 vehicles inspected annually • $5 fee per inspection • Total Costs to Sponsor: $31 361 083 / year • IS IT WORTH IT? • B/C = B – D = 217 680 913 – 145 886 165 = 2.29 • C31 361 183 • Economically Justified, Politically …

More Related