Greenbush School Maintenance Calendar. JULY. Week 1 Check clock systems Fertilize athletic fields Drag and roll baseball/softball fields Clean carpet in all buildings Week 2 Annual cleaning at Board office Drag and roll baseball/softball fields once per week

lucie
Télécharger la présentation

Greenbush School Maintenance Calendar

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Greenbush School Maintenance Calendar

  2. JULY • Week 1 • Check clock systems • Fertilize athletic fields • Drag and roll baseball/softball fields • Clean carpet in all buildings • Week 2 • Annual cleaning at Board office • Drag and roll baseball/softball fields once per week • Complete playground checklist • Week 3 • Check scoreboards, lights, and public address systems • Clean stadium facilities in preparation for football season • Drag and roll baseball/softball fields once per week • Week 4 • Trim all shrubs • Detail and service school vehicles • Drag and roll baseball/softball fields once per week

  3. AUGUST • Week 1 • Paint parking lot lines and “NO PARKING” zones • Fertilize athletic fields • Week 2 • Prepare athletic fields and practice fields for season • Walking inspection of all buildings • Order custodial supplies • Roof inspection -- high school • Week 3 • Repair and/or replace drinking fountains • Roof inspection -- North Lawn • Week 4 • Semi-annual exhaust fan inspection & service • Semi-annual fire door inspection & service

  4. SEPTEMBER • Week 1 • Fertilize athletic fields • Six-month asbestos inspection & service • Drag and roll baseball/softball fields once per week • Week 2 • Inspect all bleachers for safety • Week 3 • Prepare all boilers in system for heating season • Check treatment level and all safety devices for correct position • Check sump pumps throughout district • Change HVAC filters

  5. OCTOBER • Week 1 • Sump pump maintenance: check operation, clean and grease • Boiler start-up & check operation of all controls • Week 2 • Semi-annual check of emergency & exit lights • Change diesel fuel to winter blend

  6. NOVEMBER • Week 1 • Take off mower decks (sharpen blades & check for damage to be repaired) • Install snow blades & chains • Weekly check of water treatment blow-down and add treatment as necessary • Week 2 • Monthly check of return pumps: service & repair if necessary • Prepare scoreboards ready for basketball • Prepare baseball field for winter & spring use • Weekly check of water treatment blow-down and add treatment as necessary • Week 3 • Close football stadium for winter (if football season is over) • Aerate football field: go over field at least 4 times & apply fertilizer/weed preventer • Weekly check of water treatment blow-down and add treatment as necessary • Week 4 • Store walk-behind mowers: (sharpen blades & check for damage) • Winterize trucks, tractors, and vans • Weekly check of water treatment blow-down and add treatment as necessary

  7. DECEMBER • Week 1 • Monthly check of stadium for vandalism etc. • Monthly check of return pumps: service & repair if necessary • Monitor boiler operation and evaluation • Weekly check of water treatment blow-down and add treatment as necessary • Week 2 • Mower repair (if necessary) • Six-month asbestos inspection & service • Weekly check of water treatment blow-down and add treatment as necessary • Week 3 • Weekly check of water treatment blow-down and add treatment as necessary • Week 4 • Winter break: maintenance work that could not be completed while school is in session • Weekly check of water treatment blow-down and add treatment as necessary

  8. JANUARY • Week 1 • Monthly check of stadium for vandalism etc. • Monthly check of return pumps: service & repair if necessary • Monitor boiler operation and evaluation • Semi-annual fire door inspection & service • Weekly check of water treatment blow-down and add treatment as necessary • Week 2 • Drag and roll baseball/softball diamonds • Weekly check of water treatment blow-down and add treatment as necessary • Week 3 • Weekly check of water treatment blow-down and add treatment as necessary • Week 4 • Assess paint needs for summer painting • Weekly check of water treatment blow-down and add treatment as necessary

  9. FEBRUARY • Week 1 • Monthly check of stadium for vandalism etc. • Monthly check of return pumps: service & repair if necessary • Monitor boiler operation and evaluation • Drag and roll baseball/softball diamonds • Semi-annual fire door inspection & service • Weekly check of water treatment blow-down and add treatment as necessary • Week 2 • Order crabgrass treatment to be applied at appropriate time (on or before St. Patrick’s Day) • Weekly check of water treatment blow-down and add treatment as necessary • Week 3 • Semi-annual check of emergency & exit lights • Weekly check of water treatment blow-down and add treatment as necessary • Order HVAC Filters • Week 4 • Contact Greenbush for cooperative purchasing contract catalogs for custodial supplies • Weekly check of water treatment blow-down and add treatment as necessary

  10. MARCH • Week 1 • Aerate all practice and playing fields • Plant fescue seed on all practice fields • Monthly check of return pumps: service & repair if necessary • Apply crabgrass pre-emergent treatment • Drag and roll baseball/softball diamonds • Weekly check of water treatment blow-down and add treatment as necessary • Week 2 • Remove snow blades and chains: repair & store • Service all tractors in preparation for mowing • Drag and roll baseball/softball diamonds • Create list of areas to be painted • Weekly check of water treatment blow-down and add treatment as necessary • Week 3 • Drag and roll baseball/softball diamonds • Open stadium for spring sports: turn on water, check for leaks, repair toilets etc. • Check track for damage and repair as necessary • Week 4 • Set-up water system at stadium and check operation • Set-up water system at practice fields • Change HVAC filters

  11. APRIL • Week 1 • Exhaust fan inspection & service • Start mowing schedule as necessary • Drag and roll baseball/softball diamonds • Fertilize all fields • Week 2 • Order nitrogen fertilizer for summer application • Paint list returned for order • Week 3 • Hire summer employees • Order gym finish and applicators

  12. MAY • Week 1 • Fertilize all fields • Create summer paint schedule • Drag and roll baseball/softball diamonds • Week 2 • Finalize summer maintenance schedule • Drag and roll baseball/softball diamonds • Week 3 • Drag and roll baseball/softball diamonds • Week 4 • Drag and roll baseball/softball diamonds

  13. JUNE • Week 1 • Fertilize all fields • Six-month asbestos inspection & service • Drag and roll baseball/softball diamonds • Week 2 • Maintenance vacations can begin • Start summer crews (mowing & paint) • Drag and roll baseball/softball diamonds • Week 3 • Resurface all gym floors • Check & service all electric motors in district