  2. Pluming • Station-1 Completed. • Station-2&3 in progress • 1 octant/day by Mike Lenz Double speed by John T.’s help. done

  3. Board QA • Board QA is completed. • (Junichi)

  4. ADTX Board installation ADTX boards pluming • All ADTX boards are in. (Jimmy, Chris) • Fiber/LV cable connections are completed (St-1), in progress (St-2&3)

  5. South Thermocouple Readouts • Cable running (Jimmy, Yoshi) • Completed wiring in LV rack (Frank) • Readout GUI (Steve) • Add readouts to OPC page -> John H. • Sensors to be installed on ADTX boards (MuTrig Group) Completed To be done

  6. New Cathode Cable Installation New MuTrig Chassis Existing MuTR Chasiss To MuTR Chassis From MuTR Chamber 1 octant/expert/day  3 dedicated weeks by 2 experts to complete

  7. ADTX-FEE cable install

  8. ADTX-FEE cable Install (2) Completed • Station-1 nearly completed. Oct-3 high noise under investigation (Yoshi) • St-2&3 are in progress Station-1 Station-2&3

  9. Slows down items • Coodination with water pluming • Loose cathode cable connection at St-1 chamber. Missing hook. • Inconsistent cabling in MuTR-FEE (Seiko) • Bent pins (as usual) • Missing signal pin (found by Seiko)  swapping backplane Less thoroughness in moving forward, checking less frequently

  10. Calibration Software (Ray) • Completed pedestal analysis utility • Calibration analysis is nearly completed. • Got rid of unnecessary password typing, searching run numbers by user before execution, etc.

  11. OASys • Visualization of least square results (Naruya) • Fitting range evaluation (Junnichi) • Mechanical structure discussion w/ Walter

  12. Working on Weekends

  13. Backup Slides

  14. 4th Week September • South OASys camera alignment • Miscabling Check South camera 24, 26 • Diagnose Camera 18 • Thermocouple install on ADTX boards in South • Develop noise chart program • Develop Cathode cable miscabling checker • OASys temperature measurement and correlation • North arm Station-3, Octant-1 noise hunt • Norm arm noise issue • FCI connector debugger (soldering?) • Rack room • Setup MRG and cabling • Run LL1 Cable • Run DCMIF-DCM cable