LHC FMCM Project. Introduction. Beams dumped upon 5 occasions by FMCM following network perturbations, ie 02-MAY-10 02.59.37.127000 AM (400kV - all LHC) at 450GeV 01-MAY-10 05.50.32.127000 AM (18kV ring line, seen on dump septas) at 450GeV

lynch
Télécharger la présentation

LHC FMCM Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LHC FMCM Project

  2. Introduction Beams dumped upon 5 occasions by FMCM following network perturbations, ie 02-MAY-10 02.59.37.127000 AM (400kV - all LHC) at 450GeV 01-MAY-10 05.50.32.127000 AM (18kV ring line, seen on dump septas) at 450GeV 19-APR-10 05.14.30.396000 AM (400kV - all LHC) at 3.5 TeV 07-APR-10 06.46.58.724000 AM (18kV ring line, seen on dump septas) at 450GeV 03-APR-10 07.24.04.890000 AM (400kV - all LHC) at 3.5 TeV All trips happened at flat top (either injection or 3.5TeV) and did not result in a (self-)trip of any of the power converters, apart from the latest one 2nd of May which tripped both RD1s, RD34s and the ALICE and LHCb dipoles (+ LHC Coll and RF equipment) The trips are analyzed in the following and compared to the electrical network disturbations to confirm the validity/necessity of the current FMCM thresholds for the LHC FMCMs

  3. 02-MAY-10 02.59.37.127000 AM – RBXWTV.L2 + others ∆I = 2A ∆I /I = 3.4 •10E-3 ∆V = 1.5V ∆V /V = 5 •10E-2 Measured excursion > 1.5 Threshold : 0.6

  4. 01-MAY-10 05.50.32.127000 AM - RMSD ∆I = 0.09A ∆I /I = 1.76 •10E-3 ∆V = 2.2V ∆V /V = 7.8 •10E-2 Measured excursion > 0.8 Threshold : 0.4

  5. 19-APR-10 05.14.30.396000 AM – Trip of RD1s in IR1 an IR5 ∆I = 0.7A ∆I /I = 2 •10E-3 ∆V = 20V ∆V /V = 8 •10E-2 Measured excursion > 8 Threshold : 0.4

  6. 19-APR-10 05.14.30.396000 AM – Perturbation on RB.A12 ∆I = 0.018A ∆I /I = 3 •10E-6 ∆V = 4V ∆V /V = 8 •10E-1

  7. 07-APR-10 06.46.58.724000 AM - RMSD ∆I = 0.075A ∆I /I = 1.4 •10E-3 ∆V = 2V ∆V /V = 7.1 •10E-2 Measured excursion > 0.8 Threshold : 0.4

  8. 03-APR-10 07.24.04.890000 AM – RD34 circuit ∆I = 0.18A ∆I /I = 5.6 •10E-4 ∆V = 10V ∆V /V = 6.5 •10E-2 Measured excursion > 2.5 Threshold : 0.4

  9. 03-APR-10 07.24.04.890000 AM – Fault in 400kV S phase -40kV , 30ms Courtesy of D.Arnoult Typical perturbation originating in 400kV (2 phases, V dip of ~15% for some 60ms)

  10. Comparison to spec of “minimum immunity of equipment” • Based on the statistic of past network disturbances, a minimum immunity for equipment has been defined in an LHC ES ‘Main Parameters of LHC 400/230V Distribution System’ Voltage Swells = +50%, 10ms U nom= 400 / 230V ± 10 % Typ. Variations = ± 5 % Transients= 1200V for 0.2ms THD = 5% X X X X 03-APR-10 07.24.04.890000 AM 07-APR-10 06.46.58.724000 AM 19-APR-10 05.14.30.396000 AM 01-MAY-10 05.50.32.127000 AM Voltage Dips = -50%, 100ms

  11. Conclusions FMCMs have proven to be reliable and (rather) sensitive detectors for network perturbations RD1.LR1, RD1.LR5, RD34.LR3, RD34.LR7, RMSD.LR6B1 and RMSD.LR6B2, are connected to the 18kV distribution and thus most sensitive to perturbations coming from the 400kV. 18kV perturbations well visible on voltage of RB (but damped by >>L of circuit) FMCMs connected to the 400V network (such as the RQ4.LR3/7, RQ5.LR3/7 and RBXWTV.L2/R2) are more sensitive to local network perturbations The 5 perturbations were all within the ‘allowed’ minimum immunity requested from the equipment No converter (self-)tripped apart from event on 2nd of May (but might well happen more frequently during ramping,…) All 5 trips were well above the specified threshold for the FMCM (simulations of Verena/Andres assuming worst case scenario @ 7TeV), in all cases between 100 – 2000% above current thresholds) FMCMs tripped correctly according to current spec/requirements, as we’ll not run at 7TeV for quite some time it might be worth considering relaxing the thresholds e.g. on RMSD (to be confirmed with additional simulations?)