1 / 6

Economics of PWRI: Proposal

$. Economics of PWRI: Proposal. Outline of proposal. Enable ourselves to provide “level zero” cost estimates of different water handling / disposal options to Operating Units Based on this estimate impact on NPV Objective: Help operators “guide their thoughts”

lyre
Télécharger la présentation

Economics of PWRI: Proposal

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. $ Economics of PWRI: Proposal

  2. Outline of proposal • Enable ourselves to provide “level zero” cost estimates of different water handling / disposal options to Operating Units • Based on this estimate impact on NPV • Objective: Help operators “guide their thoughts” • No decisions made on the basis of this - you need level 4 for this • Build a number of cost databases for different generic environments, e.g. on-/offshore Europe, USA, GoM, Middle East • We should be able to estimate UTC

  3. Elements of proposal (1) CAPEX • Drilling & completion costs incl. cost breakdown (time-depth costs, completion equipment, contingencies, etc.) • Facilities costs (pumps, cleaning equipment, extra deck space required, control equipment, contingencies, etc.)

  4. Elements of proposal (2) OPEX • A ‘good’ Opex estimate should be activity-based (i.e. not generic percentages of Capex and production) Activity-types: • Well services / -maintenance: PLT’s, fall-off survey’s, re-perf, re-stim, wellhead maintenance, corrosion monitoring, etc. • Routine workovers: e.g. tubing change-out • Production costs: Operator manpower, power consumption, chemicals, routine measurements, pipeline tariffs, etc. • Maintenance costs • Overhead and related costs (direct allocated; mark-ups)

  5. Elements of proposal (3) ECONOMICS • Provide simple spreadsheet to do ‘quick-look’ economic evaluation Extra input required: • Depreciation regime • Tax / royalty percentages • Possible state participation • …..

  6. Proposed way forward • Agree on a limited set of ‘typical’ operational environments • Data gathering amongst sponsors, contractors, and third parties (e.g. major service companies) • Build simple spreadsheet with relevant Capex items + ‘typical’ costs • Build Opex spreadsheets + MSAccess databases for the set of ‘typical’ operational environments • Re-work economics spreadsheet into a more generic form

More Related