1 / 15

Overview | Source of Projects 2014-2019 Proposed Highway Improvement program

Overview | Source of Projects 2014-2019 Proposed Highway Improvement program. Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014. Presentation Schedule: 2014-2019 5-year Highway Improvement Program. Preview: 2014-15 Major Projects.

mab
Télécharger la présentation

Overview | Source of Projects 2014-2019 Proposed Highway Improvement program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Overview | Source of Projects2014-2019 Proposed Highway Improvement program Paula J. Trigg, County Engineer Public Works and Transportation Committee April 2, 2014

  2. Presentation Schedule:2014-2019 5-year Highway Improvement Program

  3. Preview: 2014-15 Major Projects • Presented at Feb 26 PWTC meeting • Transportation corridors • Meeting long-term traffic growth demands Project continued from 2013 New project (construction in 2014) Late-2014 project award (construction in 2015)

  4. Potential Project Sources • 2014-2019 5-year Highway Improvement Program effective 7/1/14, but project additions generally made for years 2015-2019 • Q:Where do ideas for the recommended projects come from to create a list of funded projects for the next 5 years? • A:from the LCDOT’s comprehensive technical, objective highway asset management tools

  5. Work Types • Bike Path • Bonds • Bridges • Culverts • Drainage • Engineering Support • Enhancements • Facilities • Guardrail • Intersection • Maintenance • Paratransit • Patch • Patrol 1 • Plan • Railroad • Reconstruction • Resurface • Resurfacing, Rehabilitation & Restoration (3R) • Road Districts • Roadway • Signals

  6. Developing the Program

  7. System preservation projects • First Priority • Keep county highway pavements, bridges bikeways, signals and related items in good condition • Project set is developed using: • ARGUS • NBIS

  8. Recurring Annual Projects:2019 Maintenance • Basin Management • Bike Path Repaving • Bituminous Markings • Bituminous Patching • Bituminous Shoulder Maintenance • Bond Payments • CMAP Assessment • Concrete Markings • Concrete Patching • Crack Sealing • Detention Right of Way • Guardrail Maintenance • ITS-PASSAGE Elements • ITS-PASSAGE Integration • ITS-PASSAGE Network • JULIE locates • Material Inspection • Microsurfacing • Miscellaneous Engineering – MT • Miscellaneous Engineering – ST • Miscellaneous Maintenance – CB • Miscellaneous Maintenance – MT • Non-motorized Travel • NPDES Phase 2 • Paratransit Dispatch Mobility Operations • Pavement Management • Pavement Markers • Retaining Wall Maintenance • Road Districts • Road Enhancements • Road Maintenance • 2012 Revised Sales Tax Plan – Engineering and ROW Support • Signal Coordination • Signal Equipment • Signal Maintenance • Tree Maintenance

  9. System modernization projects • Second Priority • Reduce delays and increase safety by accommodating short-term traffic growth and the needs of non-motorists • Project set is developed using: • TCAS • 2040 Bicycle Priorities • Non-motorized Policy guidelines • Inter/Intra County Paratransit Transportation Plan

  10. System expansion projects • Third Priority • Provide highway capacity to meet long-term traffic growth needs and provide for economic development • Project set is developed using: • Consensus Priority List • Plan for Using the new Collar County Transportation Empowerment Funds • 2040 Roadway Plan • Average Daily Traffic data • 2040 Transit Plan

  11. Lake County’s2040 Transportation plan • Long range plan to identify deficiencies and recommend improvements to address future transportation needs • In development since 2010 • Network modeled from CMAP regional model with local characteristics • Includes 2040 population and employment projections and corresponding traffic impacts • Proposed improvements prioritized based on forecasted deficiency, prior study, cost and people-jobs potential

  12. 2040 roadway Priorities • Peak period trips estimated to increase by 36% between 2010 and 2040 • 212 miles of roadway Improvements recommended • 7 interchange • 9 intersection • 65 corridor

  13. 2040 non-motorized priorities • Plan recommends an additional 300 miles of non-motorized facilities • Primarily off-street multi-use path for cyclist, pedestrian and other non-motorized use • Many projects connect to Metra and bus routes for improved viability of non-motorized travel • Provide essential non-motorized connections to communities, jobs, parks, schools, forest preserves • Jurisdiction over non-motorized facilities by Lake County DOT, Lake County Forest Preserves, townships, municipalities and institutions

  14. 2040 transit priorities • Variety of transit services are needed to address county needs: • Demand response • Fixed route bus • Commuter rail • Recommendations based on assessed needs with regard to: • Connectivity • Existing facilities and services • Jurisdictional issues • Considered previous plan results (CMAP GOTO2040, Lake County 2020 Transportation Priority Plan)

  15. Presentation Schedule:2014-2019 5-year Highway Improvement Program

More Related