1 / 8

Satur day 17.4 .

Satur day 17.4. 06: 0 0 : Physics fill from the night shift 15 : 0 0 : End stable beam mode: problems with incorporation of settings for the squeeze 16:40: Start squeeze in IR 1 & IR5: b * = 2m reached at 17:10  ca. 30 minutes total for squeeze 17:30 : Start squeeze in IR8:

Télécharger la présentation

Satur day 17.4 .

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Saturday 17.4. • 06:00: Physics fill from the night shift • 15:00: End stable beam mode: • problems with incorporation of settings for the squeeze • 16:40: Start squeeze in IR 1 & IR5: • b* = 2m reached at 17:10 ca. 30 minutes total for squeeze • 17:30: Start squeeze in IR8: • b* = 2m reached at 17:55 ca. 25 minutes total for squeeze • b-beat correction using ‘knobs’ for Q5 and Q6 adjustments done via settings. • 18:05: Start squeeze in IR2: • 18:30: Reached b* = 5m but encountered large losses for Beam2 (only a couple 10E9 left). Large coupling after trip of RQS .A78B2 the horizontal tune crossed the 1/3 resonance. Caused by too high dV/dt in function settings.

  2. Saturday 17.4. • 19:30:b-beat measurements: • b* = 5m: not sufficient intensity for Beam2 but good measurement for Beam1  20% to 30%? • b* = 3m: 20%-30% b-beating for Beam1. • RQS .A78B2 tripped again during squeeze to b* = 3m. • b* = 2m: 20%-30% b-beating for Beam1. • change of b–beat during squeeze is small! • local coupling correction • 20:00: finished b-beat measurements: • 23:30: Preliminary studies for TCD adjustments with Beam1 only • 01:00: Preparing new fill for the night • invalid time problem for RQTF circuits of Beam2 (loading of settings). • 06:00: Start lumi scans. • 06:45: Beam dumped: • again COD SIS?

  3. Saturday 17.4. • b-beat for Beam1 at b*= 2m in IR2 (all other IPS at b* = 2m):

  4. Saturday 17.4. • Coupling for Beam1 at b*= 2m in IR2 (all other IPS at b* = 2m):

  5. Saturday 17.4. • Coupling correction for Beam1 at b*= 2m in IR2 :

  6. Saturday 17.4. • Coupling correction for Beam1 at b*= 2m in IR8 :

  7. Saturday 17.4. • Losses during AC dipole measurements (b* = 3m in IP2):

  8. Sunday 18.4. • Day: • Stable beam physics fill. • Repeat optics squeeze. • b-beat measurement and correction. • Optics and orbit measurements and corrections. • IP steering. • Adjustment of tertiary collimators. • Night: • Physics fill for the night. • Monday: • Repeat ramp and squeeze procedure. • End of fill studies for establishing ‘stable beam’ conditions with squeezed optics. • Damper studies

More Related