80 likes | 221 Vues
Satur day 17.4. 06: 0 0 : Physics fill from the night shift 15 : 0 0 : End stable beam mode: problems with incorporation of settings for the squeeze 16:40: Start squeeze in IR 1 & IR5: b * = 2m reached at 17:10 ca. 30 minutes total for squeeze 17:30 : Start squeeze in IR8:
E N D
Saturday 17.4. • 06:00: Physics fill from the night shift • 15:00: End stable beam mode: • problems with incorporation of settings for the squeeze • 16:40: Start squeeze in IR 1 & IR5: • b* = 2m reached at 17:10 ca. 30 minutes total for squeeze • 17:30: Start squeeze in IR8: • b* = 2m reached at 17:55 ca. 25 minutes total for squeeze • b-beat correction using ‘knobs’ for Q5 and Q6 adjustments done via settings. • 18:05: Start squeeze in IR2: • 18:30: Reached b* = 5m but encountered large losses for Beam2 (only a couple 10E9 left). Large coupling after trip of RQS .A78B2 the horizontal tune crossed the 1/3 resonance. Caused by too high dV/dt in function settings.
Saturday 17.4. • 19:30:b-beat measurements: • b* = 5m: not sufficient intensity for Beam2 but good measurement for Beam1 20% to 30%? • b* = 3m: 20%-30% b-beating for Beam1. • RQS .A78B2 tripped again during squeeze to b* = 3m. • b* = 2m: 20%-30% b-beating for Beam1. • change of b–beat during squeeze is small! • local coupling correction • 20:00: finished b-beat measurements: • 23:30: Preliminary studies for TCD adjustments with Beam1 only • 01:00: Preparing new fill for the night • invalid time problem for RQTF circuits of Beam2 (loading of settings). • 06:00: Start lumi scans. • 06:45: Beam dumped: • again COD SIS?
Saturday 17.4. • b-beat for Beam1 at b*= 2m in IR2 (all other IPS at b* = 2m):
Saturday 17.4. • Coupling for Beam1 at b*= 2m in IR2 (all other IPS at b* = 2m):
Saturday 17.4. • Coupling correction for Beam1 at b*= 2m in IR2 :
Saturday 17.4. • Coupling correction for Beam1 at b*= 2m in IR8 :
Saturday 17.4. • Losses during AC dipole measurements (b* = 3m in IP2):
Sunday 18.4. • Day: • Stable beam physics fill. • Repeat optics squeeze. • b-beat measurement and correction. • Optics and orbit measurements and corrections. • IP steering. • Adjustment of tertiary collimators. • Night: • Physics fill for the night. • Monday: • Repeat ramp and squeeze procedure. • End of fill studies for establishing ‘stable beam’ conditions with squeezed optics. • Damper studies