Team Valeo. Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME Walter Freitag - ME Jason Zion - ME Luis Garcia - EE. Hydraulic Fan Motors. Who uses them? Why are they used? How are they built?. Needs Assessment. QPH (9)
E N D
Team Valeo Team Members Stefan Enjem – ISE Joe Van Hofwegen - ISE Young Lee - ISE Joe Pecht - ME Walter Freitag - ME Jason Zion - ME Luis Garcia - EE
Hydraulic Fan Motors • Who uses them? • Why are they used? • How are they built?
Needs Assessment • QPH (9) • 4 to 6% Increase in Production • 2 year payback • Safety and Quality
Organization • Scope and Resource Distribution • Work Breakdown Structure • Scheduling • Gantt Chart • Communication • Yahoo Web Group
Deliverables • Standardized Procedures • Preventative Maintenance • Set Production Guidelines • Fix Problematic Stations • End of Line Tester Efficiency • Identify improved system configurations
Data Collection and Analysis • Data Collection • Motor Counters • EOLT Data Sheets • Cycle Time • Historical Data
Bottleneck Identification • Histogram shows major sources of backup
Micro-stop • Micro stop = Downtime of less than 5 minutes
Industrial Standards • Clean Room • Certified Class 100,000 • QS 9000 • Quality standard TS 16949 • Valeo Union Standard • 423 minutes per shift • Ergonomic Guidelines
Detailed Procedures • Standard Procedures • Worker Rotation • Failure Response Plan
Manual Stations Station 90 Station 160 • Current Problems • Concept for Improvements • Expected Improvements
Preventative Maintenance • Creation of a Preventative Maintenance Schedule
Station 210 • Current Problems Camera for Optical Test Leak Test Connectors
Station 210 • Concepts for Improvement • Mirror • PM on Rubber Connectors Rubber Connectors • Expected Improvements • Reduction in Downtime
End of Line Tester • Function • Current Problems • Feasibility of Concepts
Mounting Concept • Linear Slide Mount
Mating Concept • Modified Assembly Cell Balancer
Technical Analysis • FEA • Air Cylinder Sizing • Expected Improvements
Arena Simulation – Our Test Plan • Analyze system as a whole • Identify optimal system configuration and alternatives • Using pallets, conveyor speed, queue sizes • Justify Improvements
Cost Analysis of Total System • Estimated Cost Analysis • Net Present Value
Future of Project • Engineering Models • Head start • Simulation • Stations • Detailed Design • Meet the Goal