1 / 4

Proposed Workshop Report Structure

Proposed Workshop Report Structure. Executive Summary – per OSTP report User requirements – Summary with NRC-style call out boxes of examples – use in CGMs, use for renewable energy and …? Plan for how to routinely have stakeholder input and feedback

madge
Télécharger la présentation

Proposed Workshop Report Structure

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposed Workshop Report Structure • Executive Summary – per OSTP report • User requirements – • Summary with NRC-style call out boxes of examples – use in CGMs, use for renewable energy and …? • Plan for how to routinely have stakeholder input and feedback • Use in national and international asessments

  2. Workshop Report (cont) • Observation Requirements • Short history • Current status and challenges (meets requirements but issue with UV/blue needs to be addressed) • Table of requirements and drivers • How we will determine success…

  3. Workshop Report (cont) • Full ERB within from the surface to TOA • What ancillary observations are required? • How are these data used? – e.g., cloud feedback, aerosol forcing, water and energy budget constraint (call out boxes?) • Table detailing ancillary requirements for ERB (must have imager with sensor…)

  4. Workshop Report (cont) • Appendices • Full metrics box • Workshop summary, notes, participants • Draft Report to Participants July 20 • Review from participants July 23 • Stakeholder review – July 26- Aug 6 • Revise week of Aug 9 • Final Participant Review week of Aug 16 • Vet to Pan-GEWEX and CERES-GERB-SCARAB • Vet and approve in NOAA chain – Sept-Oct

More Related