THEMIS Mission Integration Working Group (MIWG) #7 Ground Operations Working Group (GOWG) #5

THEMIS Mission Integration Working Group (MIWG) #7 Ground Operations Working Group (GOWG) #5 Delta - Ground Operations Review (GOR). November 29, 2006 KARS Park, KSC, Florida Hosts: Garrett Skrobot, NASA Mission Manager (MM)

madge
Télécharger la présentation

THEMIS Mission Integration Working Group (MIWG) #7 Ground Operations Working Group (GOWG) #5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THEMISMission Integration Working Group (MIWG) #7 Ground Operations Working Group (GOWG) #5 Delta - Ground Operations Review (GOR) November 29, 2006 KARS Park, KSC, Florida Hosts: Garrett Skrobot, NASA Mission Manager (MM) William Van Dyke, NASA Launch Site Integration Manager (LSIM)

  2. AgendaNovember 29, 2006 Meet-Me-Number: 1-877-991-5876  Passcode: 698067# MISSION INTEGRATION WORKING GROUP (MIWG) #7 • THEMIS Project Status P. Harvey/UCB • Payload Schedule Update (Astrotech and Launch Site Schedules) • Delta Program Status L. Loucks/Boeing • LV Hardware Status • Program Issues • Mission Integration Status L. Loucks/Boeing • Integration Schedule • Requirements Verification Matrix • SCN Review • Release of ICD Rev A • Action Item Review • Launch Site Integration Status • Side by Side Testing/Ladder Mods/SSS Installation V. Segall/Boeing • Fueling & Procedure Status C. Davis/NASA • Range Status on Required Deliverables & Procedures J. Wethern/45SW

  3. AgendaNovember 29, 2006 Meet-Me-Number: 1-877-991-5876  Passcode: 698067# MISSION INTEGRATION WORKING GROUP (MIWG) #7 - Continued • Analysis Results Boeing • DTO Update • Thermal • RF Link Analysis • Controls/ACS Gas Budget Update • Mobile Telemetry Coverage Boeing/KSC • Launch Management Update KSC • Mission Success Overview KSC • Review Spacecraft Mandatory / Required Launch Criteria KSC

  4. AgendaNovember 29, 2006Meet-Me-Number: 1-877-991-5876  Passcode: 698067# GROUND OPERATIONS WORKING GROUP (GOWG) #5/ Delta GOR • Astrotech Readiness/Issues G. Gleeson/ASO FL • THEMIS Badging & Training Plan K. Kerr/Analex KSC • Launch Site Safety Status/Readiness C. Loftin/NASA Safety • Telemetry and Communications Status/Readiness M. Lougheed/NASA KSC • Spacecraft Procedure Status/Review R. Sterling/UCB • Launch Site Readiness Poll (Go/No Go) • THEMIS Project P. Harvey • NASA KSC Public Affairs G. Diller • Boeing Delta Mission Integration V. Segall • Astrotech Mission Management G. Gleeson • NASA LS Telemetry & Communicaitons M. Lougheed • NASA KSC Safety C. Loftin • NASA LS Launch Site Integration W. Van Dyke • NASA LS Launch Site Integration Branch F. Stone