1 / 12

The Bridge

The Bridge. Moving from Task Analysis to Design. Bridge. Overview Assemble stakeholders Generate task flows Identify task objects Translate into screen objects Pros Cross-functional team User-centered Direct bridge to screen design Rapid results.

mahdis
Télécharger la présentation

The Bridge

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Bridge Moving from Task Analysis to Design

  2. Bridge • Overview • Assemble stakeholders • Generate task flows • Identify task objects • Translate into screen objects • Pros • Cross-functional team • User-centered • Direct bridge to screen design • Rapid results Task Flows -> Task Objects -> Screen Design

  3. Bridge – Materials People • Users • Stakeholders • Facilitator • Stuff • Round table • Index cards • Flip chart paper • Location • Conference Room

  4. Task Analysis Feeds Requirements • Workflow analysis uncovers problems - Users tell us: • How they currently work and what their problems are • How they would like to see these problems solved • Understands the context in which the problems occur and can write richer requirements that better describe the user’s needs • Help define the project scope • Set a strategy of where to grow your product • Prioritize the tasks to determine which release to include them

  5. Bridge – Process models • Big Picture - 50,000 foot view • Ranked by frequency and importance • Current Workflow • Issues and Bottlenecks • Blue Sky • Ranked by importance (user) and difficulty (development) • Realistic Workflow • BRIDGE • Object Identification • Protoyping

  6. How Our Process Works • Collaborative • Includes users, GUI developers, managed systems developers, tech writers, QA, Product Management • Low Tech • Uses index cards and sticky notes • Everyone can participate on an equal level • Quick • Other methodologies can take weeks or months to finish • A defined area can be completed in a day

  7. Outcomes from the Bridge Method • Structured workflows • Understanding of the work from the user’s perspective • The breadth of a user’s work • How a user thinks about tasks he/she performs in his/her day to day job • The areas that cause a user the greatest headaches • Ways that they would like to perform the work if they had their way • Objects the user needs to manipulate in the interface • A rough sketch of the foundation of the interface

  8. Big Picture Example

  9. Current Workflow Example

  10. Blue Sky Example

  11. Task Object Example • Object Name Application • Definition A GUI contrived type of Storage Asset Group • Properties • Description Name • Storage Assets Owner • Budget Service Level Agreement • Allocated Storage Mirror(s) • User selected attributes Quota Size • Quote file system(s) Quote Used Amount • Utilization history Event History • Configuration History Backups • Policies • Actions • Create Trend/Graph • Modify Delete • View Add/Delete Policy • View history Model • Backup Move • Migrate/RecallEstablish/Split/Reestablish/Delete Mirror Add/Edit/Delete user selected list • Apply predefined filters • I’m In • PSMS • In Me • Backup • Hosts • Files • Partitions(raw)

  12. Paper Prototype Example

More Related